Step 4 - Acquire C24 Communications programming
The red LED will be on solid and the blue LED will flash. The flashing of the blue LED indicates that the 3G4010CF has reques-
ted programming from C24 Communications and is waiting for a response.
Red
Blue
Yellow/Green
(Top)
Yellow/Green
(Bottom)
ON
FLASHING
-
-
Once remote programming is completed, the blue LED will switch to solid and the 3G4010CF will move to
Step 5
.
Step 5 – Receiver Initialization
The red LED and the blue LED are both solid and the signal strength LEDs are off.
Red
Blue
Yellow/Green
(Top)
Yellow/Green
(Bottom)
ON
ON
OFF
OFF
When the 3G4010CF sends a request to communicate with the central station, the top signal strength LED will begin flashing.
Red
Blue
Yellow/Green
(Top)
Yellow/Green
(Bottom)
ON
ON
FLASHING
OFF
When the central station communicates back with the 3G4010CF, the top signal strength LED will turn on solid.
Red
Blue
Yellow/Green
(Top)
Yellow/Green
(Bottom)
ON
ON
ON
OFF
When the 3G4010CF sends a request to communicate with the next central station, the bottom signal strength LED will begin
flashing
Red
Blue
Yellow/Green
(Top)
Yellow/Green
(Bottom)
ON
ON
ON
FLASHING
and turn on solid when it receives a communication back from the central station.
Red
Blue
Yellow/Green
(Top)
Yellow/Green
(Bottom)
ON
ON
ON
ON
If at least one of the central stations did not respond back to the communicator, the signal strength LED corresponding to that
central station will turn off. Once the initialization sequence is complete, the 3G4010CF will move on to steady state operation.
Step 6 - Mount the 3G4010CF
1. Power down the 3G4010 by removing the power source and battery leads.
2. Using the cabinet, mark the four screw locations. Drill the anchor screw holes.
NOTE:
Check for cable conduits and water pipes before drilling.
3. Using anchor screws (not provided), mount the cabinet to the wall.
4. Run the cables through the cable entry or through the cabinet knockouts.
5. Complete the connections on the terminal blocks [9] and [11].
NOTE:
Ensure that power and Telco circuit connections are made only after the cabinet has been secured to the building or
structure, and has been connected to the protective earth ground. Descriptions of the terminals can be found in the ‘Connecting
the 3G4010CF’ section.
6. Reattach the front cover [1] securely to the cabinet.
NOTE:
Please refer to Figure 2 and Figure 3 at the end of this manual for wiring diagrams.