CONTENT
.....................................................................
11
PREFACE .................................................................. 12
1. INTRODUCTION
............................................. 12
2.
EC DECLARATION OF CONFORMITY STORE 12
3. SAFETY
............................................................. 13
3.1 General
.............................................................. 13
3.2 Regulations
........................................................ 13
3.3 Precautions/safety instructions during installation .13
3.4 Additional safety regulations for stoves with CH
heat
exchanger................................................... 13
3.5 Required safeguards explained in more detail ..... 13
3.5.1 Thermal safety valve .......................................... 13
3.5.2 Overpressure relief valve .................................... 14
3.5.3 De-aeration ....................................................... 14
REMOVING THE PACKAGING .................................. 15
5. INSTALLATION
................................................ 15
5.1 Regulations
........................................................ 15
5.2 Flue
duct.......................................................... 145
5.3 Provisions for placing the fire ............................. 15
5.4 Placing the fire .................................................. 15
5.5 Connecting the fire ........................................... 15
6. BURNING
.......................................................... 16
7. DELIVERY
........................................................ 16
8. MAINTENANCE
................................................. 16
9. MALFUNCTIONS
............................................. 16
Appendix 1 Parts supplied ........................................... 16
Appendix 2 connections fire + line drawing ................. 17
Appendix 3 safeguards supplied ................................. 18
Appendix 4 Form for final delivery of Store H
2
O .......... 19
Appendix 5 Installation overview .................................. 20
English
Dik Geurts
11
Summary of Contents for Dik Geurts
Page 1: ...05 11 01 2016 ...
Page 2: ......
Page 9: ...Bijlage 2 Aansluiting haard Dik Geurts 7 N e d e r l a n d s 570 800 390 180 780 196 830 440 ...
Page 10: ...8 Bijlage 3 Meegeleverde beveiligingen 14 Figuur 1 Figuur 2 Figuur 3 Figuur 4 ...
Page 12: ...10 30 05 2012 Store 95 C 60 C B B A C D E F G Bijlage 5 Installatieschema ...
Page 19: ...E n g l i s h Dik Geurts 17 Appendix 2 Connection fire 570 800 390 180 780 196 830 440 ...
Page 22: ...20 30 05 2012 Store 95 C 60 C B B A C D E F G Appendix 5 Installation overview ...
Page 29: ...Annexe 2 Raccordement poêle F r a n ç a i s Dik Geurts 27 570 800 390 180 780 196 830 440 ...
Page 32: ...30 30 05 2012 Store 95 C 60 C B B A C D E F G Annexe 5 ...
Page 33: ...Dik Geurts 31 ...
Page 34: ......