background image

5/9 

 

6. UNPACKING AND INSTALLATION 

 

 
 
 
 
 

6.1 UNPACKING  

Once a suitable installation position has been identified, unpack the pump and prepare for installation. It is important to inspect 
the pump to ensure that there has been no damage during transportation. The packaging  material used does not require any 
special disposal procedures. You should refer to you regional requirements. 

 

6.2 PUMP INSTALLATION  

Allow sufficient space for install with 150mm clear space around the perimeter of the pump. 
Mount the pump Locopump

Serie2

 at “eye level” to avoid any risk of postural problems. 

Do not install the pump in dangerous environments such as explosive/flammable areas or in areas subject to high vibration. 
Only use the fixing holes on the support bracket which are intended for n°2 holes for screws Ø10 mm (0,4 in.)(use a flat washer 
with the screw ). For more details of the fixing holes please verify the dimensions shown on the drawing in chapter 12. 

 

6.3 ELECTRICAL CONNECTIONS 

Ensure the electrical connection of the low level is connected before using the pump. See below drawing for connection details. 
A label of this drawing is also on the pump’s reservoir. 
 

 

Supply voltage 24 V max. 

 

6.4 PUMP OUTLET CONNECTION 

The hydraulic connection of the pump is on the front face of the pump. It is a standard 1/4” BSP ( see drawing in chapter 12 ). 

 

6.5 AIR CONNECTION ON PUMP  

Use an 1/8”  BSP connection fitting. It also possible to use DropsA’s nut an cone fittings as the seating is already available.  
Remember to use a 3/2 valve that allows the air to vent to atmosphere and the internal spring within the pump to reset.  
 

6.6 HOW TO ADJUST THE PUMP OUTPUT OR PRESSURE 

This can be done  by: Regulating pressure: the output  pressure has a  50:1 ratio with the inlet  pressure.  Therefore this can be 
regulated depending on the requirements of the system. (See chapter 4 for min and max pressures). 
Regulating pump: as standard the pump has a fixed output. For special requirements you can convert the pump by installing the 
kit 3133390 – 

ordered separately to the pump 

– the kit is shown below. 

To use this kit , mount the o-ring  ( A ) then tighten the fitting ( B ) with a 27mm spanner. Loosen the counter nut (C) with a 13 
mm  spanner  to  unblock  the  screw  (D),  use  the  appropriate  screw  driver  to  screw  IN  for  less  output  or  screw  OUT  for  more 
output. After adjustments have been made you must tighten the counter nut (C) to block any further movements. 
 
 
 
 
 
 
 
 
 
 
 

N.B.: 

After all connections have been made please ensure that they are safe and properly secured down. 

 

                   WARNING: 

The unit is only to be opened and repaired by specialist personnel. 

  

 

Summary of Contents for LOCOPUMP S3

Page 1: ...CS 5 COMPONENTS 6 UNPACKING AND INSTALLING 7 OPERATING INSTRUCTIONS 8 TROUBLESHOOTING 9 MAINTENANCE PROCEDURE 10 DISPOSAL 11 ORDERING INFORMATION 12 DIMENSIONS 13 HANDLING AND TRANSPORTATION 14 OPERAT...

Page 2: ...r and an adjustable delivery kit Loading connection is completed of a filter guaranteeing the input of clean lubricant into the reservoir It s possible to use a filtered clean grease return in the res...

Page 3: ...rease output The level sensor is and electric contact that indicates that the pump has reached its low level of grease It s possible to set it to either Normally Closed or Normally Open see drawing fo...

Page 4: ...hread that allows interfacing with up to two 400cc lubricant cartridges High Reliability is guaranteed by the use of hardened steel in the construction in all the pumping element components and the pu...

Page 5: ...LET CONNECTION The hydraulic connection of the pump is on the front face of the pump It is a standard 1 4 BSP see drawing in chapter 12 6 5 AIR CONNECTION ON PUMP Use an 1 8 BSP connection fitting It...

Page 6: ...ss the start button on the machine to which the Sumo pump is connected Check pump start up Check that the machine is adequately lubricated if there are still some doubts about its correct functioning...

Page 7: ...le All components must be clean with cleaning fluid and lubricated before re assembly Periodically it is necessary to check CHECK TOTAL NUMBER OF PUMP CYCLES The lubrication status 100 Lubricant level...

Page 8: ...future maintenance increase the spaces indicated by at least 100 mm 2 Kg 0 5 Kg H 433 272 AIR INLET G1 8 BSP Compression fitting for 6 pipe LUBRICANT OUTLET G1 4 BSP LUBRICANT INLET Valved Greaser UNI...

Page 9: ...eans of compiling the checklists already made available and contained in the technical file Two types of lists were used List of dangers section from UNI EN ISO 14121 1 relating to UNI EN ISO 12100 Ap...

Reviews: