background image

3/9 

 

5. COMPONENTS  

The main parts of the pump are: 
 

The reservoir

 constructed of transparent type plastic, compatible with commercially available greases. 

 

The pump body,

 constructed of steel with capability of delivery up to 2 cm³ (0,12 cu.in) per stroke at a maximum pressure of 

300 bar (4351 psi). There is an internal check valve mechanism for the grease output. 
 

The level sensor

, is and electric contact that indicates that the pump has reached its low level of grease. It's possible to set it to 

either “Normally Closed” or “Normally Open” (see drawing for further instruction). As standard is set to “Normally Closed”.

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PART NUMBER 

DESCRIPTION 

3044522 

Reservoir 2 Kg. (4,4 lb) 

3044525 

Reservoir 0.5 Kg. (1,1 lb) 

3045202 

Support Bracket 

3413502 

Body pump 

1655183 

Minimum level sensor 

712100 

Refilling Filter 

 

Reservoir 2 kg 

Square support

 

Body pump  

Refilling 
filter 

Minimum 
level sensor 

Air supply

 

Discharge

 

Summary of Contents for LOCOPUMP S3

Page 1: ...CS 5 COMPONENTS 6 UNPACKING AND INSTALLING 7 OPERATING INSTRUCTIONS 8 TROUBLESHOOTING 9 MAINTENANCE PROCEDURE 10 DISPOSAL 11 ORDERING INFORMATION 12 DIMENSIONS 13 HANDLING AND TRANSPORTATION 14 OPERAT...

Page 2: ...r and an adjustable delivery kit Loading connection is completed of a filter guaranteeing the input of clean lubricant into the reservoir It s possible to use a filtered clean grease return in the res...

Page 3: ...rease output The level sensor is and electric contact that indicates that the pump has reached its low level of grease It s possible to set it to either Normally Closed or Normally Open see drawing fo...

Page 4: ...hread that allows interfacing with up to two 400cc lubricant cartridges High Reliability is guaranteed by the use of hardened steel in the construction in all the pumping element components and the pu...

Page 5: ...LET CONNECTION The hydraulic connection of the pump is on the front face of the pump It is a standard 1 4 BSP see drawing in chapter 12 6 5 AIR CONNECTION ON PUMP Use an 1 8 BSP connection fitting It...

Page 6: ...ss the start button on the machine to which the Sumo pump is connected Check pump start up Check that the machine is adequately lubricated if there are still some doubts about its correct functioning...

Page 7: ...le All components must be clean with cleaning fluid and lubricated before re assembly Periodically it is necessary to check CHECK TOTAL NUMBER OF PUMP CYCLES The lubrication status 100 Lubricant level...

Page 8: ...future maintenance increase the spaces indicated by at least 100 mm 2 Kg 0 5 Kg H 433 272 AIR INLET G1 8 BSP Compression fitting for 6 pipe LUBRICANT OUTLET G1 4 BSP LUBRICANT INLET Valved Greaser UNI...

Page 9: ...eans of compiling the checklists already made available and contained in the technical file Two types of lists were used List of dangers section from UNI EN ISO 14121 1 relating to UNI EN ISO 12100 Ap...

Reviews: