background image

4/9 

 

5.1

 

PNEUMATIC GREASE PUMP WITH STANDARDIZED 400CC LUBRICANT CARTRIDGE LOADING SYSTEM 

 
The  Pneumatic  Pump  with  cartridge  grease  loading  is  a  pump  for  general  use  in  single  line 
progressive divider lubrication systems such as SMX, SMO, SMP or SMPM.  
 
The  pump  is  designed  for  all  those  applications  where  it  is  ideal  to  have  grease  supplied  in  readily 
available cartridges. 
The pump is equipped with a steel plate with a M57x1.5 mm thread that allows interfacing with up to 
two 400cc lubricant cartridges. 
 
High  Reliability  is  guaranteed  by  the  use  of  hardened  steel  in  the  construction  in  all  the  pumping 
element components and the pump piston is manufactured in ground hardened steel. 

 

5.1.1 DIMENSIONS 

 

 

 

5.1.2 ORDER INFORMATION 

 

PART NUMBER 

DESCRIPTION 

3414064 

Pneumatic pump with cartridge 
loading 

SPARES 

3190372 

Seal gasket  

0061117 

Gasket 

3050564 

Flange connection 

3413500 

Pneumatic pump grease R= 50:1  

3133390 

Pump delivery adjustment kit  

 

OVERALL  

DIMENSIONS 

QUOTE OF FASTENING 

115 

~480 

252 

100 

60 

 

 

 

3190372 

0061117 

0061117 

3050564 

3413502 
3133390 

 

Summary of Contents for LOCOPUMP S3

Page 1: ...CS 5 COMPONENTS 6 UNPACKING AND INSTALLING 7 OPERATING INSTRUCTIONS 8 TROUBLESHOOTING 9 MAINTENANCE PROCEDURE 10 DISPOSAL 11 ORDERING INFORMATION 12 DIMENSIONS 13 HANDLING AND TRANSPORTATION 14 OPERAT...

Page 2: ...r and an adjustable delivery kit Loading connection is completed of a filter guaranteeing the input of clean lubricant into the reservoir It s possible to use a filtered clean grease return in the res...

Page 3: ...rease output The level sensor is and electric contact that indicates that the pump has reached its low level of grease It s possible to set it to either Normally Closed or Normally Open see drawing fo...

Page 4: ...hread that allows interfacing with up to two 400cc lubricant cartridges High Reliability is guaranteed by the use of hardened steel in the construction in all the pumping element components and the pu...

Page 5: ...LET CONNECTION The hydraulic connection of the pump is on the front face of the pump It is a standard 1 4 BSP see drawing in chapter 12 6 5 AIR CONNECTION ON PUMP Use an 1 8 BSP connection fitting It...

Page 6: ...ss the start button on the machine to which the Sumo pump is connected Check pump start up Check that the machine is adequately lubricated if there are still some doubts about its correct functioning...

Page 7: ...le All components must be clean with cleaning fluid and lubricated before re assembly Periodically it is necessary to check CHECK TOTAL NUMBER OF PUMP CYCLES The lubrication status 100 Lubricant level...

Page 8: ...future maintenance increase the spaces indicated by at least 100 mm 2 Kg 0 5 Kg H 433 272 AIR INLET G1 8 BSP Compression fitting for 6 pipe LUBRICANT OUTLET G1 4 BSP LUBRICANT INLET Valved Greaser UNI...

Page 9: ...eans of compiling the checklists already made available and contained in the technical file Two types of lists were used List of dangers section from UNI EN ISO 14121 1 relating to UNI EN ISO 12100 Ap...

Reviews: