HT-2000 Installation and Operation Manual
30
7 Clearances to Combustible Material
The clearances shown in this section have been determined by test according to
procedures set out in safety standards ULC S627 (Canada) and UL1482 (U.S.A.). When
the stove is installed so that its surfaces are at or beyond the minimum clearances
specified, combustible surfaces will not overheat under normal and even abnormal
operating conditions.
No part of the stove or flue pipe may be located closer to combustibles than the
minimum clearances given below.
7.1 Location of the certification label
Since the information given on the certification label affixed to the appliance always
overrides the information published, in any other media (owner’s manual, catalogues,
flyers, magazines and/or web sites) it is important to refer to it in order to have a safe and
compliant installation. In addition, you will find information about your stove (model, serial
number, etc.). You can find the certification label on the back of the stove.
7.2 Clearances to Walls and Ceiling
The clearances to combustible walls may be slightly different in Canada and the U.S.A.
and may also differ depending on whether you use single or double wall flue pipe. Please
be sure to choose the correct clearance for your location and type of flue pipe. See figure
Clearances to combustible materials and floor protection
to match each letter to a
clearance.
CLEARANCES
(SINGLE WALL PIPE)
CANADA
USA
A
19” (485 mm)
19” (485 mm)
B
19” (485 mm)
19” (485 mm)
C
11” (280 mm)
11” (280 mm)
D
23” (585 mm)
23” (585 mm)
E
30” (765 mm)
30” (765 mm)
F
23” (585 mm)
23” (585 mm)
K
48" (1220 mm)
48" (1220 mm)
L
84" (213 cm)
84" (213 cm)
CLEARANCES
(DOUBLE WALL PIPE)
CANADA
USA
A
10” (255 mm)
10” (255 mm)
B
14” (360 mm)
14” (360 mm)
C
8” (205 mm)
8” (205 mm)
D
14” (360 mm)
14” (360 mm)
E
25” (635 mm)
25” (635 mm)
F
20” (510 mm)
20” (510 mm)
K
48" (1220 mm)
48" (1220 mm)
L
84" (213 cm)
84" (213 cm)
Summary of Contents for HT-2000
Page 8: ...HT 2000 Installation and Operation Manual 8 ...
Page 9: ...HT 2000 Installation and Operation Manual 9 ...
Page 34: ...HT 2000 Installation and Operation Manual 34 Clearances for shield construction ...
Page 52: ...HT 2000 Installation and Operation Manual 52 Appendix 6 Exploded Diagram and Parts List ...