![Drolet HT-2000 Installation And Operation Manual Download Page 38](http://html1.mh-extra.com/html/drolet/ht-2000/ht-2000_installation-and-operation-manual_2532630038.webp)
HT-2000 Installation and Operation Manual
38
8.2.2 Masonry
Chimneys
The stove may also be connected to a
masonry chimney, provided the
chimney complies with the construction
rules found in the building code
enforced locally. The chimney must
have either a clay liner or a suitably
listed stainless steel liner. If the
masonry chimney has a square or
rectangular liner that is larger in cross
sectional area than a round 6” flue, it
should be relined with a suitably listed
6” stainless steel liner. Do not
downsize the flue to less than 6” unless
the venting system is straight and
exceeds 25 feet in height. When
passing through a combustible wall, the
use of an insulated listed thimble is
required.
8.3 Minimum Chimney Height
The top of the chimney should be
tall enough to be above the air
turbulence caused when wind
blows against the house and its
roof. The chimney must extend at
least 1 m (3 ft.) above the highest
point of contact with the roof, and
at least 60 cm (2 ft.) higher than
any roof line or obstacle within a
horizontal distance of 3 m (10 ft.).
Summary of Contents for HT-2000
Page 8: ...HT 2000 Installation and Operation Manual 8 ...
Page 9: ...HT 2000 Installation and Operation Manual 9 ...
Page 34: ...HT 2000 Installation and Operation Manual 34 Clearances for shield construction ...
Page 52: ...HT 2000 Installation and Operation Manual 52 Appendix 6 Exploded Diagram and Parts List ...