HT-2000 Installation and Operation Manual
50
Appendix 5: Baffle Installation
1- Remove the front secondary air tube
(A) and its cotter pin (B) and the
three first bricks (C) on the right side
of the combustion chamber.
2- Pile up one insulation blanket (E) and
an insulation weight (F) upon one
baffle board (D). Insert them into the
combustion chamber and pass them
over the air channels. Push them to
the back of the combustion
chamber, making sure the baffle sits
well on both air channels
.
3- Repeat step 2 to install the second
baffle
.
4- Put back in place the previously
removed secondary air tube (A) and
its cotter pin (B) as well as the three
bricks (C).
Summary of Contents for HT-2000
Page 8: ...HT 2000 Installation and Operation Manual 8 ...
Page 9: ...HT 2000 Installation and Operation Manual 9 ...
Page 34: ...HT 2000 Installation and Operation Manual 34 Clearances for shield construction ...
Page 52: ...HT 2000 Installation and Operation Manual 52 Appendix 6 Exploded Diagram and Parts List ...