HT-2000 Installation and Operation Manual
11
2.4 The SBI Commitment to You and the Environment
The SBI team is committed to protecting the environment, so we do everything we can to
use only materials in our products that will have no lasting negative impact on the
environment.
2.4.1 What is Your New Stove Made Of?
The body of your stove, which is most of its weight, is carbon steel. Should it ever become
necessary many years in the future, almost the entire stove can be recycled into new
products, thus eliminating the need to mine new materials.
The paint coat on your stove is very thin. Its VOC content (Volatile Organic Components)
is very low. VOCs can be responsible for smog, so all the paint used during the
manufacturing process meets the latest air quality requirements with regards to VOC
reduction or elimination.
The air tubes are stainless steel, which can also be recycled.
The C-Cast baffle is made of an aluminosilicate fibre material that is compressed with a
binder to form a rigid board. C-Cast can withstand temperatures above 2,000 °F. It is not
considered hazardous waste. Disposal at a landfill is recommended.
Firebrick is mainly composed of silicon dioxide, also known as silica, an earth derived
product. It is most commonly found in nature in the form of sand and clay. Disposal at a
landfill is recommended.
The door and glass gaskets are fibreglass which is spun from melted sand. Black gaskets
have been dipped into a solvent-free solution. Disposal at a landfill is recommended.
The door glass is a 5 mm thick ceramic material that contains no toxic chemicals. It is
basically made of raw earth materials such as sand and quartz that are combined in such
a way to form a glass at high temperatures. Ceramic glass will not re-melt in the same
way as normal glass, so it should not be recycled with your regular household products.
Disposal at a landfill is recommended.
Summary of Contents for HT-2000
Page 8: ...HT 2000 Installation and Operation Manual 8 ...
Page 9: ...HT 2000 Installation and Operation Manual 9 ...
Page 34: ...HT 2000 Installation and Operation Manual 34 Clearances for shield construction ...
Page 52: ...HT 2000 Installation and Operation Manual 52 Appendix 6 Exploded Diagram and Parts List ...