HT-2000 Installation and Operation Manual
49
Appendix 4: Installation of Secondary Air Tubes
1-Starting with the rear tube, lean and
insert the right end of the secondary air
tube into the rear right channel hole.
Then lift and insert the left end of the tube
into the rear left channel.
2- Align the last hole of the tube in the left
air channel spigot hole. Insert a cotter pin
in order to maintain the tube in place.
3- Fold-up the cotter pin end to lock the
tube.
4- Repeat
step 1, 2 & 3
for the other
secondary air tubes.
5- To remove the tubes use the above
steps in reverse order.
Summary of Contents for HT-2000
Page 8: ...HT 2000 Installation and Operation Manual 8 ...
Page 9: ...HT 2000 Installation and Operation Manual 9 ...
Page 34: ...HT 2000 Installation and Operation Manual 34 Clearances for shield construction ...
Page 52: ...HT 2000 Installation and Operation Manual 52 Appendix 6 Exploded Diagram and Parts List ...