
Eco-65 Installation and Operation Manual
21
4.5.4 Through a Factory Built Chimney
To make an installation through a factory
built chimney, run a 4" stainless steel liner
inside the factory built chimney.
1. Position stove following clearances
given in
Section 3.2: Minimum
Clearances to Combustibles
and
following vent manufacturer’s
instructions.
2. Install a cleanout tee to the stove
exhaust. If necessary, use a horizontal
additional length between the exhaust
and the tee. If you wish to center the
vertical part of the vent with the stove, a
45° elbow and a tee can be used to
route the pipe from the exhaust towards
the back center of the stove.
3. Connect the pellet vent to the stainless
steel liner according to the vent
manufacturer’s instructions.
4. Seal and install vertical roof vent. If
required, seal and install a storm collar.
WARNING: IN THE U.S., THE USE OF A STAINLESS STEEL LINER IS MANDATORY. IN
CANADA, IT IS NOT MANDATORY BUT IS STRONGLY RECOMMENDED.
NOTE: VENTING DIRECTLY IN AN OVERSIZED CHIMNEY AND OMITTING THE USE OF
A STAINLESS STEEL LINER CAN AFFECT CHIMNEY DRAFT AND DECREASE STOVE
PERFORMANCES.
Summary of Contents for ECO-65
Page 67: ...Eco 65 Installation and Operation Manual 67 9 Wiring Diagram ...
Page 79: ...Eco 65 Installation and Operation Manual 79 14 Exploded View and Replacement Parts SECTION A ...
Page 80: ...Eco 65 Installation and Operation Manual 80 SECTION B ...
Page 81: ...Eco 65 Installation and Operation Manual 81 SECTION C ...
Page 82: ...Eco 65 Installation and Operation Manual 82 SECTION D SECTION E ...
Page 83: ...Eco 65 Installation and Operation Manual 83 SECTION F SECTION G ...
Page 84: ...Eco 65 Installation and Operation Manual 84 SECTION H SECTION I ...
Page 85: ...Eco 65 Installation and Operation Manual 85 SECTION J ...