Dräger G 50770 Installation Instructions & Instructions For Use Download Page 12

12

Acceptance and handover to the operator

Schválení a p

ř

edání obsluze

Acceptance and handover to the 
operator

Monitor R is a component of the central gas supply 
system for medical gases, compressed air and vacuum in 
Dräger Gas Management.

The system must not be commissioned until acceptance 
by specially trained expert personnel.

National regulations must be observed.

For example EN 737-3 applies in the European Economic 
Area.

After completing the installation or after carrying out 
maintenance operations, a test and acceptance 
programme is carried out by experts.

This test establishes:

– whether the safety requirements for the protection of 

the patient are satisfied.

and

– whether the performance features of the central supply 

system and Dräger Gas Management are satisfied.

The test results must be recorded in writing. Following 
acceptance, the operational system complete with 
associated documents is handed over to the operator.
Handover must be recorded in an official document.

Schválení a p

ř

edání obsluze

Monitor R je sou

č

ástí centrálního rozvodu medicinálních 

plyn

ů

, stla

č

eného medicinálního vzduchu a medicinálního 

podtlaku v systému 

ř

ízení plyn

ů

 Dräger.

Tento systém smí být uveden do provozu až po schválení 
a p

ř

evzetí odborníky se speciální kvalifikací.

Ř

i

ď

te se místními p

ř

edpisy.

Č

eské republice je to nap

ř

íklad 

Č

SN EN 737-3.

Po skon

č

ení montáže nebo údržby musí následovat 

zkušební a schvalovací proces ze strany odborníka.

Úkolem t

ě

chto test

ů

 je zjistit, 

– zda jsou spln

ě

ny bezpe

č

nostní požadavky na ochranu 

pacienta a nemocni

č

ního personálu

a

– zda centrální rozvod medicinálních plyn

ů

 i systém 

ř

ízení plyn

ů

 Dräger spl

ň

ují požadované výkonnostní 

parametry.

Výsledky test

ů

 musejí být písemn

ě

 zaprotokolovány. 

Po schválení je funk

č

ní systém p

ř

edán i s p

ř

íslušnou 

dokumentací provozovateli.
P

ř

edání musí být oficiáln

ě

 zdokumentováno.

Summary of Contents for G 50770

Page 1: ...00137296 Installation Instructions Instructions for Use Mont n n vod N vod k pou it Gas Management Monitor R...

Page 2: ...ystem 10 Maintenance intervals 10 Technical data 11 Acceptance and handover to the operator 12 System overview 13 Obsah Pro va i bezpe nost 3 P edpokl dan pou it 4 Mont 4 Mont Monitoru R 4 P prava p i...

Page 3: ...endations given above The warranty and liability provisions of the terms of sale and delivery of Dr gerwerk Aktiengesellschaft are likewise not modified by the recommendations given above Dr gerwerk A...

Page 4: ...L x H 160 x 360 x 100 mm Monitor R dimensions W x L x H 86 x 105 x 58 mm 00137296 00237296 105 58 86 19 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36...

Page 5: ...cable types should be agreed with the design department for each project LON Local Operating Network regi stered trade mark of the Echelon com pany P prava p ipojovac ho kabelu Provozn nap t Voliteln...

Page 6: ...hen using 24V DC Ensure correct polarity 00337296 Ub Ub Schirm1 Shield 1 La1 Lb1 00437296 IN OUT 1 2 3 4 LA LB S LA LB S LA LB S LA LB S LA LB S F1 F 6 3 A 24V Network 24V Network Syst mov kabel s t G...

Page 7: ...al 23 Ground to connection 24 NC NC 1 Test Service Digitaleingang 2 3 4 5 6 7 8 13 23 33 43 34 44 14 24 Relais 53 63 73 83 74 84 54 64 Relais Bus SH Bus B Bus A OUT IN 24V 24V NC neobsazeno P pojky Vs...

Page 8: ...ease note that for fault free operation in the network a terminating resistor LON terminator G 50 769 or Monitor CC G 50 718 is required Ulo te kabel v krabici tak aby se elektronick sou sti a st n n...

Page 9: ...s status with the appropriate configuration can be transmitted via a relay signal fault relay In this case relay No 8 is used Provoz kolem rel ov ho modulu je odes lat jednotliv a hromadn hl en s t ze...

Page 10: ...ck and visual inspection by specially trained experts We recommend that you take out a Service Contract with Dr ger Service 00637296 19 1 2 3 5 6 7 8 9 10 11 12 13 14 15 16 17 18 20 21 22 24 25 26 27...

Page 11: ...ing current DC1 24V 150 mA Max switching current DC13 24V 50 mA Code UMDNS Universal Medical Device Nomenclature System 18 046 Technick daje Po adavky na okoln prost ed Teplota 15 o C a 40 o C Relativ...

Page 12: ...st be recorded in writing Following acceptance the operational system complete with associated documents is handed over to the operator Handover must be recorded in an official document Schv len a p e...

Page 13: ...W UP Set 310 G 50 742 HW UP Set 400 G 50 743 AP Set 250 G 50 745 AP Set 310 G 50 746 AP Set 400 G 50 747 AP Housing 360 G 50 748 P ehled syst mu Pro datovou s t syst mu zen plyn se dod vaj tyto sou st...

Page 14: ...rail G 50 731 Communication cable e g GM network system cable G 50 750 Designation description Part No Sou sti syst mu jsou mezi sebou propojeny s t LON V jednom segmentu sm b t vz jemn propojeno max...

Page 15: ...15 This page intentionally left blank T to strana bola ponechan z merne pr zdn...

Page 16: ...beck 49 451 8 82 0 FAX 49 451 8 82 20 80 http www draeger com 90 55 461 MA GA 6918 020 en cs Dr gerwerk AG Co KGaA Edition 1 2015 10 Subject to alteration 90 55 461 MA GA 6918 020 en cs Dr gerwerk AG...

Reviews: