Securing the unit
We recommend that you secure the unit to the concrete pad by using four (4) TAPCON screws and washers.
(See drawing below.)
Pool Heat Pump _9
POOL HEAT PUMP INSTALLATION
Condensation and Drainage
The evaporator coil will produce condensation while the unit is running and drain at a steady rate, usually three to five
gallons per hour, depending on the ambient air temperature and humidity.
It is normal for condensation to drip out the
CONDENSATION WATER DRAIN PIPE
that is located on the side of the unit.
(See drawing below.)
A:
CONDENSATION WATER DRAIN PIPE
B:
WINTERIZING DRAIN (with plastic caps)
A:
Concrete Pad
B:
1/4” x 1-1/2” Stainless Steel Concrete Screw
and Washer (Provided by installer)
C:
3/16” Drilled Hole
3” minimum
A
B
C
A
B
Summary of Contents for 100 HPRA-410
Page 1: ...50HPRA 410 80 HPRA 410 100 HPRA 410 410 OWNER S MANUAL POOL HEAT PUMP MDPL 00001A A ENGLISH ...
Page 14: ...Pool Heat Pump _13 WIRING DIAGRAM 50HPRA 410 80HPRA 410 100HPRA 410 ...
Page 25: ...Pool Heat Pump _24 NOTES ...
Page 26: ...43 de l Alcazar Blainville Québec Canada J7B 1R4 www dplpool com ...