A-25
INSTRUCTION TO REMOVE THE BELT ON THE CONVEYOR
BEFORE YOU BEGIN SPLICING
DISCONNECT THE POWER TO THE CONVEYOR
FOR FULL STRAND SPLICING
1.
Begin splicing in the center.
¾
Make sure the strand matches the belt to be spliced.
¾
INSERT the strand ends into the center space of the opposite edge
(see space 3 on diagram).
¾
Pull the ends of the strand through until the center space “locks” in place.
¾
It is critical to straighten each splice before moving onto the next step.
¾
USE OUR WIRE STRAIGHTENING TOOL.
2.
Upon completion of splice.
¾
Check drive sprocket alignment.
¾
Adjust tension.
A - BEND WIRE IN CENTER.
Summary of Contents for FC18
Page 37: ......
Page 39: ...B 2 TOP DIFFUSER DIFFUSEUR DU HAUT B 2 ...
Page 40: ...B 3 BOTTOM DIFFUSER DIFFUSEUR DU BAS B 3 ...
Page 41: ...B 4 FC2 FC2 B 4 ...
Page 42: ...B 5 BOTTOM DIFFUSER DIFFUSEUR DU BAS B 5 ...
Page 43: ...B 6 TOP DIFFUSER DIFFUSEUR DU HAUT B 6 ...
Page 44: ...C 1 SECTION C COMPONENT PARTS PIÈCES COMPOSANTE FC18 FRONT VIEW FC18 VUE DE FACE C 1 ...
Page 46: ...C 3 FC18 SIDE VIEW FC18 VUE DE CÔTÉ C 3 ...
Page 48: ...C 5 FC2 FRONT VIEW FC2 VUE DE FACE C 5 ...
Page 50: ...C 7 FC2 TOP VIEW FC2 VUE DE DESSUS C 7 ...
Page 53: ...ALL MODELS FC18 220V COIL TOUS LES MODÈLES FC18 BOBINE 220V D 2 ...
Page 54: ...ALL MODELS FC2 120V COIL TOUS LES MODÈLES FC2 BOBINE 120V D 3 ...
Page 55: ...ALL MODELS FC2 220V COIL TOUS LES MODÈLES FC2 BOBINE 220V D 4 ...
Page 56: ......
Page 57: ......
Page 58: ......