background image

1.5  FCC Compliance

This system complies with Part 15 of the Federal Communications Commission (FCC) Rules & Regulations. 
Operation is applicable to these conditions: 

l

      This device must not cause harmful interference.

l

      This device must accept interference received. This includes interference that can cause undesired 

operation.

M1700 FSC3000 Installation Manual | Dover Fueling Solutions

13

Summary of Contents for Petro Vend FSC3000

Page 1: ...Petro Vend FSC3000 Installation Manual Part Number M1700 Revision 15 1 FSC3000 ...

Page 2: ...ver Fueling Solutions UK Ltd and their affiliated entities Contact OPW Fuel Management Systems 6900 Santa Fe Drive Hodgkins IL 60525 USA Visit us at https www doverfuelingsolutions com Sales Support 888 679 3835 7 30 a m to 4 00 p m US CST Email orders to FMSorders doverfs com Send billing inquiries to Dbs_na_ar_inquiries dovercorp com Call 1 877 OPW TECH 877 679 8324 For calls outside US and Cana...

Page 3: ...bal com opw fms tech support technician registration l Bennett 3800 Duo 2 l Bennett 3800 Single l Bennett Mechanical l Fill Rite l Gasboy 9100 Dispenser l Gasboy 9100 Duo 1 Pump l Gasboy 9100 Duo 2 Pump l Gasboy 9800 Dispenser l Gasboy Pump l Gasboy 9850KX l Wayne Reliance Dual Dispenser l Wayne Reliance Duo 2 l Wayne Reliance Single Dispenser l Wayne Reliance Single Pump l Wayne Select Dual l Way...

Page 4: ... 2 1 PV380 DigiServe PV384 Lantronix Boards 16 2 2 Technical Specifications 18 2 2 1 Remote vs Integrated FSC3000 18 2 3 Components Diagrams 19 2 3 1 Main Board Components 19 2 3 2 Parts Listings Accessories Exploded View 19 2 3 3 System Wiring Schematics 21 2 4 Ports 23 2 4 1 USB Key 23 2 4 2 Ethernet 24 2 4 3 Phone Line 25 2 4 4 RS 485 26 2 4 5 RS 232 27 2 5 Installation 37 2 5 1 Integrated FSC3...

Page 5: ...mp Control DPC 49 3 1 1 Wayne and Gilbarco 49 3 1 2 Gasboy 49 3 1 3 DPC Technical Specifications 49 3 1 4 DPC Installation 50 3 1 5 DPC Pump Control Electronic Control Conduit Requirements 50 3 1 6 DPC Interface in a Remote Enclosure for Wayne and Gilbarco 51 3 1 6 1 Wayne Data Distribution Box Connection to DPC Board 52 3 1 6 2 Gilbarco D Box Connection to DPC Board 53 3 1 7 Install a DPC Interfa...

Page 6: ...ilbarco CRIND Card Reader in Dispenser 63 3 2 3 Diagrams 64 3 2 3 1 Wayne DTC 64 3 2 3 2 Gilbarco DTC 64 3 2 3 3 Gilbarco Secure Prompts DTC 65 3 2 4 DTC Installation 66 3 2 4 1 DTC Remote Enclosure Installation 66 3 2 5 Physical Configuration 67 3 2 5 1 Wayne CAT specific 67 3 2 5 2 Gilbarco CRIND specific 68 3 2 6 Software Configuration 69 Section 4 Maintenance Troubleshooting 70 4 1 FSC3000 Rem...

Page 7: ...Warranty 78 M1700 FSC3000 Installation Manual Dover Fueling Solutions 7 ...

Page 8: ...S IN THIS MANUAL For your protection obey all safety panels warnings and instructions where they occur Read the safety and compliance information completely in the sections that follow before you begin installation DANGER To prevent the possibility of explosion or fire do not use electrical or battery operated power tools in or near the Hazardous Area Only use pneumatic or hand tools M1700 FSC3000...

Page 9: ...esult in death or serious injury CAUTION Indicates a possibly hazardous situation that if not prevented could result in minor or moderate injury NOTICE Indicates important information not related to hazards A condition that if not prevented can result in property damage SAFETY INSTRUCTIONS Indicates instructions and procedures related to safety or gives the location of safety equipment 1 2 Informa...

Page 10: ...re that is recommended to make another step or procedure easier INFORMATION This panel shows references to more information in other sources READ CAREFULLY This panel points to information that must be fully read and understood before doing the procedure s that comes after M1700 FSC3000 Installation Manual Dover Fueling Solutions 10 ...

Page 11: ...A to make sure your installation is correct Installers must obey the instructions in this document to complete a safe installation For installations outside the United States make sure that the installation obeys all applicable local codes The installer must know and obey all applicable local codes in the country or county where this unit is installed NOTE Local codes can specify special installat...

Page 12: ...vices l Use correct grounding methods l Use an ESD Field Service Kit with wrist strap dissipative mat and grounding cord when possible l When possible do not stand on carpeted surfaces while you do work with Electrostatic Discharge Sensitive ESDS devices l Do not keep ESDS components assemblies where there is a risk of damage l A new component should be kept in its anti static package as long as p...

Page 13: ...sion FCC Rules Regulations Operation is applicable to these conditions l This device must not cause harmful interference l This device must accept interference received This includes interference that can cause undesired operation M1700 FSC3000 Installation Manual Dover Fueling Solutions 13 ...

Page 14: ...s used To avoid possible explosion or fire do not replace the lithium battery with a type that is not compatible The battery used in this device can present a risk of fire or chemical burn if used incorrectly Do not disassemble heat above 100 C or incinerate Discard a used replaced battery immediately Keep away from children Do not disassemble and do not discard in fire The inside of the console c...

Page 15: ...ion circuit i e Petro Net The FSC verifies the card data collects all fuel transaction data and stores local proprietary card flies The FSC3000 is equipped with the released PCI Payment Card Industry Security Standards application software a requirement by most credit card and fleet card processors which assures merchants and their customers that the FSC3000 Multi trucking System does not store se...

Page 16: ...ove You will need the correct PC software for the type of main board in your unit to configure the IP Address of the FSC3000 Fuel Site Controller s network adaptor Go to https www opwglobal com opw fms tech support software other software downloads to find the software download you need For the PV384 Lantronix board files look for the file Lantronix Device Finder For the PV380 Digi board you will ...

Page 17: ... board see Configuring the FSC IP Address on page 42 for instructions on how to configure the IP Address of the FSC3000 Fuel Site Controller s network adaptor M1700 FSC3000 Installation Manual Dover Fueling Solutions 17 ...

Page 18: ...rd Integrated Remote vs Integrated FSC3000 Specifications Remote FSC3000 Integrated FSC3000 Cabinet Dimensions H x W x D 2 25 x 10 x 8 25 5 7 cm x 25 4 cm x 21 cm See specific FIT specifications Power Requirements 85 240 VAC 50 60 Hz 25 watts maximum See specific FIT specifications Operating Temperature Range 32 F 122 F 0 C 50 C See specific FIT specifications One 1 DIN RS 485 Petro Net Max Length...

Page 19: ...ry fleet networks DPC etc The SIMM card also contains a backup battery to maintain all data in memory in the event of a power loss Remove the battery insulating strip to activate a SIMM memory module Gently remove the yellow strip at this time It is recommended that the SIMM module be reseated 2 3 2 Parts Listings Accessories Exploded View FSC3000 Parts List Item No Part Number Description 1 75 20...

Page 20: ...m No Part Number Description 11 20 4089 01 Internal FSC3000 Display 12 20 7073 Journal Printer with Cable 13 20 7078 Network Modem 14 75 2047 Indoor Wireless Modem M1700 FSC3000 Installation Manual Dover Fueling Solutions 20 ...

Page 21: ...2 3 3 System Wiring Schematics Typical System Installation Diagram with Electronic Pump Control M1700 FSC3000 Installation Manual Dover Fueling Solutions 21 ...

Page 22: ...Typical System Installation Diagram with Mechanical Pump Control M1700 FSC3000 Installation Manual Dover Fueling Solutions 22 ...

Page 23: ...for retrieving transaction data The USB key can then be removed from the FSC3000 and plugged into a PC The stored transaction data could then be imported into the optional Phoenix software package used to generate reports l Also if the FSC3000 has the optional card update feature card updates can also be transferred through the USB key M1700 FSC3000 Installation Manual Dover Fueling Solutions 23 ...

Page 24: ... not allowed for the Admin user account Network Connecting via Ethernet Ethernet connect allows you to connect to the FSC3000 through the site s network Connect network cable not provided into network jack Refer to FSC3000 Ethernet Port Setup section for configuring the Ethernet port NOTE Maximum cable distance of 300 feet 100 m M1700 FSC3000 Installation Manual Dover Fueling Solutions 24 ...

Page 25: ...ial in modem l Can only be used with an analog phone line Connecting via Dial in Modem A Dial In modem allows remote access by Phone Line Connect Phone cord into the Phone Line port and connect to phone jack Dial In modem only supports analog Phone Lines M1700 FSC3000 Installation Manual Dover Fueling Solutions 25 ...

Page 26: ...Pump Control Terminals The supplied cable P N 20 1443 connects the J box to the FSC3000 This is also referred to as the Petro Net communication Connect FSC Petro Net cable from FSC3000 RS 485 port to 4x4 Petro Net junction box cover Description Part FSC Petro Net Cable 20 1443 RS 422 Junction Box cover 20 8035 M1700 FSC3000 Installation Manual Dover Fueling Solutions 26 ...

Page 27: ...Serial adapters Connect 20 1520 01 cable RJ 45 connector into port 1 and the other side into a serial port l Port 1 Is the direct serial connection port to an onsite PC The PC must be within 50 feet 15 2 m and use the cable connection P N 20 1520 01 NOTE Port 1 can be connected to a serial port on the IP Gateway or a Cell Modem to provide inbound access The maximum cable distance is 50 feet 15 m M...

Page 28: ...nsactions are printed real time to the Journal printer Midnight totals print at 12 00 a m each day System log will print monthly when enabled Connect Journal printer into port 3 Refer to Journal Printer Configuration section for setup of Journal printer parameters Description Part Journal Printer Cable 20 1517 05 Journal Printer Includes 20 1517 05 20 7073 M1700 FSC3000 Installation Manual Dover F...

Page 29: ...econd host port is optional Connect Host IP Gateway to port 5 for single host IP Gateway installation Optional second host IP Gateway connection will be in port 6 l Port 5 Is used to connect the primary host fleet network IP Gateway l Port 6 Is used to connect secondary host fleet IP Gateway IP Gateways provide a secure connection to the fleet card networks via the Internet There are two different...

Page 30: ...17 01 cable to connect this port to FSC3000 serial port 5 the primary authorization port green cable in the illustration 2 Inbound Access to the FSC for remote configuration or transaction polling ex Phoenix can be provided through the second serial port on the IP Gateway Abierto version only This eliminates the need for an Ethernet connection directly to the FSC3000 To make this connection connec...

Page 31: ...le in the illustration 6 Connect a second Ethernet cable not supplied from the second Gateway to another Ethernet access point yellow cable in the illustration 7 Plug the Gateway power supply into an outlet and into the Gateway s power input Other Connections 8 Make sure your Access Point Router is connected to the internet navy cable in the illustration 9 Make sure your Access Point Router power ...

Page 32: ... Part Number Description Qty 20 1617 20 1618 Cellular Wireless Cellular Modem 20 1617 for AT T or 20 1618 for Verizon 1 75 2062 Cellular 4G Blade Antenna 2 07 3017 Power Supply 1 20 1519 01 CABLE RJ45 TO DB9M DTE 1 NOTE Inbound serial communication parameters 38400 7 E 1 NOTE Part Numbers in Green Bold text in the component list above are availabe as replacement items See the newest Fuel Control P...

Page 33: ...FSC3000 External Connections Inbound Outbound with Cellular Modem and IP Gateway M1700 FSC3000 Installation Manual Dover Fueling Solutions 33 ...

Page 34: ...e cable to the Ethernet port of the IP Gateway l Connect the other end of the cable to the Cellular Modem Ethernet port 5 Power Cable supplied l Connect the barrel end plug of the cable to the Power jack of the IP Gateway Push the end into the socket and turn 90 clockwise to lock the plug l Connect the AC Adapter end to an AC power outlet 6 Be sure your Network Router power is connected to an AC p...

Page 35: ... optional Price Sign interface The Price Sign option will allow the FSC300 to interface with the Future Media Price Vision Displays that use Price Vision protocol with version 1 07 Using this option allows the FSC3000 to send current pricing to the display Pass Thru Connection RS 232 port 8 The FSC3000 supports a Pass thru Connection that allows you to utilize the single access connection like the...

Page 36: ...iminates the need for an additional PC connection to the Tank Gauge for sites using the optional Phoenix software polling both the FSC3000 fuel transactions and ATG data for performing site reconciliation n Communication parameters for the ATG connected to the Pass Thru port must match the FSC3000 communication parameters M1700 FSC3000 Installation Manual Dover Fueling Solutions 36 ...

Page 37: ...e line or Ethernet connection 300 91 4 m max or Serial Cable 50 15 2 m max to access the FSC3000 Wires Wire Requirements Serial Cable 50 15 2 m Phone Line N A Ethernet Cable 300 91 4 m may be extended with repeaters NOTE This conduit is not required when using stand alone FSC3000 or wireless communications 2 5 2 Remote FSC3000 The remote FSC3000 must be placed in an office like environment The FSC...

Page 38: ...3000 located in a building They can also be used to connect between FITs at different fuel islands See OPW Manual M00 20 7074 for complete information on the suitability and installation of these modems NOTE Currently wireless Petro Net is not supported on OPW AVI enabled systems 2 5 5 Additional System Options Prior to Configuration Startup and Testing per your specific system parameters install ...

Page 39: ...e device that is being connected to the pass thru port If possible set the device to the highest setting the FSC3000 supports 2 6 2 Direct Connect Serial Communication to PC Set the communication parameters as follows l Baud Rate Up to 38400 l Data Bits 7 l Parity Even l Stop 1 2 6 3 PC Connection via Dial In This method uses the optional internal modem you remotely connect to the FSC3000 via an a...

Page 40: ...the following LED Light Behaviors Network Link Status Top Left yellow OFF No Link Has Been Detected ON Link Has Been Detected Serial Port Network Activity Top Right green OFF Serial Channel is Idle BLINKING Serial Data is Transmitted or Received M1700 FSC3000 Installation Manual Dover Fueling Solutions 40 ...

Page 41: ...old both front panel buttons while simultaneously plugging the power cord back into the FSC3000 3 Wait for a beep then release the buttons 4 Verify the system displays COLD START and check for proper operation 2 7 2 Software Configuration ARTWare ARTWare is a Windows PC based configuration utility that simplifies the programming of the FSC3000 ARTWare can be used in an online or off line mode In t...

Page 42: ...igure the IP address of the Fuel Site Controller s network adapter ARTWare can be downloaded from the OPW FMS website at https www opwglobal com opw fms tech support software other software downloads See PV380 DigiServe PV384 Lantronix Boards on page 16 for information on what main board is installed in your FSC3000 Instructions for IP address configuration with the PV384 Lantronix board can be fo...

Page 43: ...ars in the list 6 Once the Digi Device Discovery program identifies the device you can choose to configure the device to have a static IP address or to automatically obtain an address from the DHCP server 7 With the Digi device selected click the Configure network settings option in the Device Tasks section of the program to configure the IP address NOTE Because the OPW applications used to config...

Page 44: ...essing Card Updates will be seen while the FSC is updating the positive card file When complete the card update file is deleted and the display will show Card Update Complete Remove Key The Key must then be removed It can be reinserted or a different key can be inserted to begin storing transaction data USB Key Transaction Recording Operation The FSC3000 detects when a key is inserted and displays...

Page 45: ...Shortcut from the menu This now provides a direct access path to the Phoenix data folder for the following operations Importing Transactions from the USB Key into Phoenix 1 Using the USB key from the FSC plug it into the PC and open a Windows Explorer window to the USB key 2 Locate the file named K2500 trn 3 Right click on the file and select Cut from the menu 4 Open the shortcut to the Data folde...

Page 46: ...d select Cut from the menu 5 Open a Windows Explorer window to the USB key and select Paste from the Edit menu 6 Once the file is copied remove the USB key and place it in the FSC to perform the update card Journal Printer Setup Menu Option Setting Menu Option Setting Page length for tractor 11 28 cm Parity Even Skip over perforation Off Data length 7 bit Auto tear off Off Parallel I F mode Off Au...

Page 47: ... when printer is off Verify USB records transaction Verify system allows disallows fueling when USB is removed Verify if device is installed on Pass Thru port it is accessible Verify if equipped Price Sign shows correct price Network enabled systems Verify network card can authorize pump Verify transaction is recorded correctly Verify with network transaction is captured correctly Phoenix equipped...

Page 48: ... of PCMs l Direct Pump Control DPC This is an electronic dispenser control solution that lets the FSC3000 directly control electronic dispensers through the manufacturer s dispenser protocol The FSC3000 can communicate directly with Wayne Gilbarco and Gasboy dispensers Refer to Direct Pump Control DPC on the next page for information n Dispenser Terminal Control DTC This electronic control method ...

Page 49: ...rd to control a maximum of 16 fueling points eight 8 double sided or eight 8 fueling points for 16 single sided dispensers or any combination 3 1 2 Gasboy Gasboy dispensers use an RS 232 to RS 485 converter board for isolation and the correct interface The dispensers all wire in a 2 wire multi drop configuration Up to 16 fueling points can be controlled This can be any combination of single and do...

Page 50: ...ld only contain the Pump Control wires with the exception noted below Wires required are per dispenser if conduit is running to two double sided fuel pumps then two times the wire is required as shown below Wires per fueling point Wire Requirements Pump Control Two wires must meet pump manufacturer s specification for the controlled pump NOTE When using manufacturer s D Box only two wires need to ...

Page 51: ... electrical shock de energize the system before you do this procedure 1 Install the enclosure on a wall with four 4 fasteners not supplied The enclosure must be no further than 50 15 24 m from the FSC3000 controller 2 Install 1 2 or 3 4 rigid steel conduit for the DPC Power Supply 3 Pull three 3 14 AWG wires from the breaker panel 4 Install 1 2 or 3 4 rigid steel conduit for pump communication 5 P...

Page 52: ...pump communication wires to each pump loop on CN5 See the illustration above for up to four 4 pumps connected directly to connector CN5 of the DPC board For more than four 4 pump loops use the manufacturer s distribution box see below for connections to Wayne and Gilbarco distribution boxes 8 Connect the RJ45 connector to CN4 3 1 6 1 Wayne Data Distribution Box Connection to DPC Board Wayne Data D...

Page 53: ...ed to DPC interface Make sure that the Gilbarco is setup for current loop l Connect the cable P N 12 3004 on page 50 from CN 4 of the DPC Interface to Port 4 on the FSC3000 controller NOTE The cable can be extended up to 50 15 2 m M1700 FSC3000 Installation Manual Dover Fueling Solutions 53 ...

Page 54: ...ou will first need to install a 20 4428 Pedestal Board Plate NOTE The illustrations show installation with a PV200 terminal Installation with a PV100 and PV300E are the same l Remove the four 4 50 0008 8 32 KEPS nuts from the studs on the inner back wall of the pedestal l Align the holes of the 20 4428 Plate with the studs to put the plate in its correct position The holes at the bottom of the pla...

Page 55: ...ster 12 3004 Cable RJ45 to RJ45 54 0439 DPC Jumper Setup Label 1 Install the DPC Interface Board l Remove the four 4 top 8 32 KEPS nuts from the top left set of studs of the Pedestal Board Plate l Align the 20 0612 board with the studs l Put the 8 32 KEPS nuts back on the studs and tighten them M1700 FSC3000 Installation Manual Dover Fueling Solutions 55 ...

Page 56: ...e terminal screw and the orange to the other Polarity is not important b Put the Molex connector end of the 20 1618 cable through an open knockout hole in the bottom of the terminal c For PV200 installation connect the Molex end to an available connector of the Petro Net Power board J6 J7 or J8 for PV300E installations connect the Molex connector to the PCM plug on the front of the power supply as...

Page 57: ...terminal c The routing of the cable should be around the inside of the terminal so it is out of the way of internal components d Connect the other end to RS 232 Port 4 of the FSC INFORMATION The illustration above shows the ports as they are seen from the top of the FSC3000 Port 4 is the one on the left of the back row of RS 232 ports M1700 FSC3000 Installation Manual Dover Fueling Solutions 57 ...

Page 58: ...nterface for Gasboy Installation 1 Attach the power supply 07 3004 and isolated converter 75 2036 to the mounting plate 51 0357 with the four 4 1 inch self lock adhesive fasteners 50 2144 2 Install the mounting plate with power supply and converter attached within 5 1 52 m of the FSC3000 3 Plug the serial cable P N 20 1519 04 into the isolated converter 9 pin port and then into Port 4 of the FSC30...

Page 59: ...iversal Mounting Plate Installation You will first need to install a 20 4428 Pedestal Board Plate See 20 4428 Board Plate Assembly Installation on page 54 for information on how to install the Board Plate in the pedestal l Remove the four 4 top 8 32 KEPS nuts from the top left set of studs of the Pedestal Board Plate l Align the 51 0357 Universal Mounting Plate with the studs l Put the 8 32 KEPS n...

Page 60: ...n knockout hole in the bottom of the terminal 4 For PV200 installation connect the Molex end to an available connector of the Petro Net Power board J6 J7 or J8 for PV300E installations connect the Molex connector to the PCM plug on the front of the power supply assembly See the illustration below 5 Connect the 20 1519 04 RJ45 to DB9 Cable Assembly l Connect the DB9 connector of the assembly to the...

Page 61: ...n wiring to the converter as shown in the illustration on page 58 3 1 9 Physical Configuration Set up jumpers to match the pump type to be connected See the Wayne Gilbarco Jumper Settings illustrations below When a jumper is set as ON this means the jumper will tie both pins together When OFF the jumper should be set on one pin Some jumpers have three pins when the jumper says Pins 1 2 this means ...

Page 62: ...completed during installation 3 1 11 Testing There is no preliminary testing that can be done with the DPC The DPC will only be able to be verified when configuration of the FSC3000 is complete M1700 FSC3000 Installation Manual Dover Fueling Solutions 62 ...

Page 63: ...he Jade boards of these terminals do not have RS485 RS232 capability 3 2 2 1 Wayne CAT Card Authorization Terminal The DTC board has RS 485 ports to communicate directly to the Wayne CATs Up to 12 fueling points can be controlled This can be six 6 dual sided dispensers 12 single sided dispensers or any combination thereof 3 2 2 2 Gilbarco CRIND Card Reader in Dispenser In addition to the DTC board...

Page 64: ...3 2 3 Diagrams 3 2 3 1 Wayne DTC 3 2 3 2 Gilbarco DTC M1700 FSC3000 Installation Manual Dover Fueling Solutions 64 ...

Page 65: ...3 2 3 3 Gilbarco Secure Prompts DTC M1700 FSC3000 Installation Manual Dover Fueling Solutions 65 ...

Page 66: ...r more than four 4 pump loops use the manufacturer s distribution box Pump communication conduit is not required if the manufacturer s distribution box is located near the remote DPC enclosure 5 Connect Line Neutral and Ground wires from the breaker panel to the power connection block 6 Connect Petro Net wires to the Petro Net block IMPORTANT Maintain polarity throughout all Petro Net connections ...

Page 67: ...o terminal blocks CN5 through CN8 For best performance connect each dispenser to its own terminal block If there are up to 12 CAT dispensers connect a maximum of 3 dispensers to each terminal block Make sure the jumpers are set according to the diagram as shown above The jumpers marked with connect termination resistors on the dispenser communication lines Install these jumpers only if you experie...

Page 68: ...terminal blocks CN5 of the DPC board If connecting more than four 4 dispensers connect loop one 1 to the Gilbarco D Box using the supplied cable as shown below Connect the Gilbarco Universal distribution box D Box to DPC interface with the 20 1689 interface cable IMPORTANT Make sure that the the Gilbarco D Box is set up for current loop M1700 FSC3000 Installation Manual Dover Fueling Solutions 68 ...

Page 69: ...or DTC software configuration please refer to the M1702 Dispenser Terminal Control Software Configuration Guide located on the OPW FMS website at www opwglobal com opw fms M1700 FSC3000 Installation Manual Dover Fueling Solutions 69 ...

Page 70: ...ap and a non abrasive cloth If Keypad is damaged replace it Door Locks Lubricate door locks every six months or as needed Use graphite or molybdenum disulfide Moly B dry lubricant DO NOT apply too much lubricant Card Readers l Magnetic Card Magnetic card readers contain magnetic heads like those on a tape recorder Depending on usage and environment dusty you should clean the heads daily or every o...

Page 71: ...ntain a dot matrix printer please refer to the following procedures Equipment Needed l Safety goggles l Protective gloves l Cotton cleaning swabs l Duster can HFC 134a l Isopropyl or denatured alcohol l Moist wipes l Dry cloth or paper towels The following procedure is suggested every six months 1 Turn off power switch and unplug the printer 2 Remove top dust cover printer ribbon and paper from gu...

Page 72: ...erify if pump is equipped with OPW AVI nozzle reader that pump can be authorized with tag Pump Control PCM DPC Pump Control 2 Position Number 1 2 3 4 5 6 7 8 Write down associated pump number Verify the correct pump turns on Verify pump timers are set up as required Verify maximum quantity is set up as required Using card with no quantity restriction setup verifies pump turns off when maximum quan...

Page 73: ...uipped with OPW AVI nozzle reader that pump can be authorized with tag Pump Control PCM DPC Pump Control 4 Position Number 1 2 3 4 5 6 7 8 Write down associated pump number Verify the correct pump turns on Verify pump timers are set up as required Verify maximum quantity is set up as required Using card with no quantity restriction setup verifies pump turns off when maximum quantity is reached Ver...

Page 74: ...uipped with OPW AVI nozzle reader that pump can be authorized with tag Pump Control PCM DPC Pump Control 6 Position Number 1 2 3 4 5 6 7 8 Write down associated pump number Verify the correct pump turns on Verify pump timers are set up as required Verify maximum quantity is set up as required Using card with no quantity restriction setup verifies pump turns off when maximum quantity is reached Ver...

Page 75: ...uipped with OPW AVI nozzle reader that pump can be authorized with tag Pump Control PCM DPC Pump Control 8 Position Number 1 2 3 4 5 6 7 8 Write down associated pump number Verify the correct pump turns on Verify pump timers are set up as required Verify maximum quantity is set up as required Using card with no quantity restriction setup verifies pump turns off when maximum quantity is reached Ver...

Page 76: ...1 10 15 Replaced 2 illustrations showing Gilbarco Wayne jumper settings with facsimile of the door label 54 0493 highlighting the correct jumper positions for both 10 989 6 10 16 Support for S00601 PCM 107G 11 1114 2 1 17 Add missing illustration for Dis penser Power Reset in Section 5 12 1240 10 4 17 Update Parts Required table Sec tion 5 4 2 to correct part numbers and Oracle descriptions Update...

Page 77: ... Ports section update Pump Control section to reflect current offerings in Oracle 15 2023 3 30 22 Add info for PV380 PV384 boards 15 1 2023 4 6 22 Add link to above change to Star tup and Test section NOTE It is possible that older software versions might not support all features M1700 FSC3000 Installation Manual Dover Fueling Solutions 77 ...

Page 78: ... purpose and of all other obligations or liabilities on OPW Fuel Management Systems part Further OPW Fuel Management Systems neither assumes nor authorizes any other person to assume for it any other liability in connection with the sale of the systems or any new replacement part that has been subject to any damage from any act of nature or any force majeure Any terms proposed by the Original Purc...

Page 79: ......

Reviews: