System Testing
Once the FSC3000 has been configured for the site-specific components and operating parameters, the
entire system operation must be tested.
FSC3000 Testing Checklist
ü
Verify all connection methods to be utilized by site are functional (direct, modem, Bluetooth®, etc.)
Verify all FITs, PCMs, UPCs are communicating on Petro-Net
Verify all FSC3000 options required are enabled - (Networks, DPC, transaction/card limits, etc.)
Verify card buffer is set up to customer needs
Verify Journal Printer print transactions
Verify Printer has required information
Verify system allows/disallows fueling when printer is off
Verify USB records transaction
Verify system allows/disallows fueling when USB is removed
Verify if device is installed on Pass-Thru port it is accessible
Verify if equipped, Price Sign shows correct price
Network-enabled systems
Verify network card can authorize pump
Verify transaction is recorded correctly
Verify with network transaction is captured correctly
Phoenix-equipped systems
Verify Phoenix™ can connect to FSC3000
Verify FSC3000 transaction string is set correctly for polling
Verify Phoenix™ tables match FSC3000 tables (i.e., products, restrictions, etc.)
Verify Card update process works
Verify Polling works
Verify if Phoenix™ has reconciliation and equipped ATG can be polled (i.e., Pass-Thru, direct, etc.)