
2.5 Installation
2.5.1 Integrated FSC3000 Communication Conduit
Follow the instructions below if the FSC3000 is to be installed in one of the FITs.
NOTE:
If the installation is for a Remote FSC3000, see "Remote FSC3000" below.
This conduit is required when you use a FIT with an integrated FSC3000 controller. This conduit will provide
access for a phone line or Ethernet connection [300' (91.4 m) max.], or Serial Cable [50' (15.2 m) max.] to
access the FSC3000.
Wires
Wire Requirements
Serial Cable
50' (15.2 m)
Phone-Line
N/A
Ethernet Cable
300' (91.4 m) may be extended with repeaters
NOTE:
This conduit is not required when using stand-alone FSC3000 or wireless
communications.
2.5.2 Remote FSC3000
The remote FSC3000 must be placed in an office-like environment. The FSC3000 Petro-Net junction box
should be mounted within 6’ (1.8 m) of the FSC3000 controller.
M1700 FSC3000 Installation Manual | Dover Fueling Solutions
37