INSTALL PRESSURE PADS
Step 7
Fix the pressure pads both to each other and to the
horizontal beams of the side supports and make sure
everything is filled up.
INSTALL BOTTOM RAIL LOCATOR
Step 8
Assemble the bottom side rails stamped “S” between the
side vertical assemblies, as indicated on the plan.
POSITION SIDE VERTICAL SHIMS
(WITH PROTRUDING HORIZONTAL
BEAM)
Step 5b
Place the horizontal beam level. The side supports will
stand straight again by the pressure of the water.
DIG OUT FOR PRESSURE PADS
Step 6
Remove dirt at the spot of the pressure pads so that
the pressure pads can be assembled on the horizontal
beams of the side support assemblies.
A S S E M B L Y I N S T R U C T I O N S S U N L A K E - O V A L - P A G E 7
slope
side support assembly
level
fill with concrete
firm
undisturbed
earth
concrete blocks
side support
assembly
62 cm
2,5 cm
5 cm
Make scribes approx.
2,5 cm deep at the
spot of the pressure
pads
61 cm
# 10 Screws
# 12 Screws
# 12 Screws
notch out
Begin
here
pressure pad
Work from left to right
side vertical assembly
bottom side rails stamped “S”
bottom rail
locator
pressure
pad