M O N T A G E I N S T R U C T I E C E N T U R Y - P A G I N A 1
A S S E M B L Y I N S T R U C T I O N S S U N L A K E - O V A L - P A G E 1 0
Figure 13B
Joint A 4,90
Joint B 4,90
Hole chart for ovale pools
Joint A
Joint B
Hole 1 – Top rail
C
C
Hole 1 – End cap
S3
16
Hole 2 – Top rail
18/24
C
Hole 2 – End cap
S3
16
Hole 3 – Top rail
C
C
Hole 3 – End cap
S3
16
Hole 4 – Top rail
18/24
C
Hole 4 – End cap
S3
16
INSTALL TOP RAILS + HOLES CHART
FOR TOP RAILS
(SUNLAKE
8,50 X 4,90)
Step 13b
There are two different joints, a straight and a round
joint. A, B, C straight / D round (see fig. 13 B).
Four screws connect the top rails with the vertical end
caps. Screw the screws in the right holes of the top rails
and vertical end caps.
Follow the measures of the holes chart.
Holes with numbers 1 and 3 are of the inside of the pool.
Holes with numbers 2 and 4 are of the outside of the
pool.
INSTALL TOP RAILS + HOLES CHART
FOR TOP RAILS
(SUNLAKE
9,75 X 4,90)
Step 13c
There are two different joints, a straight and a round
joint. A, B, C straight / D round (see fig. 13 C).
Four screws connect the top rails with the vertical end
caps. Screw the screws in the right holes of the top rails
and vertical end caps.
Follow the measures of the holes chart.
Holes with numbers 1 and 3 are of the inside of the pool.
Holes with numbers 2 and 4 are of the outside of the
pool.
Joint A, B, C 4,90
Joint D 4,90
Hole chart for ovale pools
Joint A,B,C
Joint D
Hole 1 - Top rail
C
C
Hole 1 - End cap
C2
16
Hole 2 - Top rail
28
C
Hole 2 - End cap
C1
16
Hole 3 - Top rail
C
C
Hole 3 - End cap
C2
16
Hole 4 - Top rail
28
C
Hole 4 - End cap
C1
16
D B A C D
D C A B D
Figure 13C