M O N T A G E   I N S T R U C T I E   C E N T U R Y   -   P A G I N A   1

Feed towards pump 

gate of filter

Check valve

(Recommended)

Space between the top of the pool 

and stabilizer sand 22 cm

Grade 2 cm per meter

Stabilisierter Sand 

Füllen Sie erst das Schwimmbecken, 

bevor Sie den stabilisierten Sand  

auffüllen.

PVC tube and fixtures

Valve

(Recommended)

Retour towards 

return gate 

filter

bility to have easy access for maintenance or repairs.
ATTENTION: If the filling up takes place immediately 
around the skimmer, it shall be more difficult in the futu-
re to check the skimmer during leaks.

Doughboy is in no way liable for the expenses pertaining 
to the finding and/or repairing of leaks, cutting, breaking 
off and/or removing of stabilizing sand.

PREPARATION OF STABILIZER SAND

Mixing ratio 1 m3 fluvial sand with 125 kg concrete.

IMPORTANT WARNING: 

Regardless the method used for the way the stabilized 
sand is applied, you should pay close attention to the 
wall of the pool during filling to be sure that the wall 
does not collapse. If a dent occurs in the pool wall, 
someone should enter the pool to push it back.
If this is not possible, you should lower the pressure to 
the pool wall by removing the mixture 
used to fill up the pool locally again so 
that the dent can be removed. Then 
carefully fill up the pool again. You 
should at all times pay attention to the 
pool wall until the pool is completely 
filled up. To prevent rust on the pool 
wall, the water streaming out of the pool 
should immediately be removed from the 
pool wall. For this you should let the top 
layer run off at least 2 cm such as can 
be seen from the illustration. After the 
mixture has been applied completely, 
you should lower the water level to the 
top line of the skimmer opening and cut 
away the liner in the skimmer opening.

IMPORTANT MESSAGE: 

Piling up of loose material between the mixture and the 
poor wall may push in the wall. If extra material is placed 
between the mixture and the cover material to get this at 
the correct height, you should only use a sturdy mortar.

A S S E M B L Y   I N S T R U C T I O N S   S U N L A K E   -   O V A L   -   P A G E   1 6

FIG. 2 SPECIFIC INSTALLATION

FIG.3 - WITH/WITOUT PATIO BLOCKS

Without patio blocks

With patio blocks

Stabilized sand

Keep the stabilized sand 5 cm below 

the screw of the guard

Keep the patio blocks 5 cm below 

the screw of the guard

Stabilized sand

Top of the 

patio block 

Summary of Contents for SUNLAKE Series

Page 1: ...A S S E M B L Y I N S T R U C T I O N S S U N L A K E O V A L P A G E 1 SUNLAKE OVAL POOLS ASSEMBLY INSTRUCTIONS...

Page 2: ...y be damaged or cause personal injury 3 Do not attempt to lift the heavy boxes by yourself To reduce the possibility of personal injury have some one help you move heavy boxes pool wall liner etc WARN...

Page 3: ...tlet for the pump 9 2 or 3 people for assistance during assembly 10 Do not build in case of strong wind 11 Walking space around your pool 60 cm 12 Put your pool on a level underground 13 In case of bu...

Page 4: ...12 685 312 312 445 640 10 50 x 5 50m 266 488 555 302 pool radius clearance radius string line support clearance side support stake 61 122 122 122 61 272 266 555 266 266 399 550 POOL SIZES 6 10 x 3 60m...

Page 5: ...e liner The entire assembled pool framework must sit on flat ground STAKES AND STRING LINES Step 3 Locate 4 stakes C D E and F in accordance with indi cated measures of the plan of your pool Attach st...

Page 6: ...5 Place two concrete blocks into the excavations and place the assembled side supports into each trench perpendicular so that the front side of the side support is situated to the tautly wire POSITION...

Page 7: ...pressure of the water DIG OUT FOR PRESSURE PADS Step 6 Remove dirt at the spot of the pressure pads so that the pressure pads can be assembled on the horizontal beams of the side support assemblies A...

Page 8: ...of the side vertical assemblies with the end rails stamped with 12 When the bottom condition is not optimal place a patio block under every vertical end cap sunk on bottom level for extra certainty IN...

Page 9: ...3 A Four screws connect the top rails with the vertical end caps Screw the screws in the right holes of the top rails and vertical end caps Follow the measures of the holes chart Holes with numbers 1...

Page 10: ...ps Follow the measures of the holes chart Holes with numbers 1 and 3 are of the inside of the pool Holes with numbers 2 and 4 are of the outside of the pool INSTALL TOP RAILS HOLES CHART FOR TOP RAILS...

Page 11: ...18 Hole 4 Top rail 28 28 28 C Hole 4 End cap C1 S1 C1 18 D B A C D D C A B D Figure 13D Joint C 5 50 Joint D 5 50 INSTALL TOP RAILS HOLES CHART FOR TOP RAILS SUNLAKE 10 50 X 5 50 Step 13d There are tw...

Page 12: ...N L A K E O V A L P A G E 1 2 INSTALL TOP RAILS HOLES CHART FOR TOP RAILS SUNLAKE 12 50 X 6 40 Step 13e There are two different joints a straight and a round joint A B C straight D round see fig 13 E...

Page 13: ...is achieved and re clamp the binder clips Remember that you are monitoring a minimum tightness of the liner over rail that will control the liner seating itself against the pool floor and up the side...

Page 14: ...L COPING AND STABILIZER RAILS Step 20 Make a return hem as illustrated and smooth the liner against the wall see plan Place the coping over the liner and the stabilizer rails over the coping after pus...

Page 15: ...be installed according to the installation ins truction delivered with the pool INSTALLATION OF SKIMMER AND INLET The skimmer and the inlet have to be installed before the pool is filled with water a...

Page 16: ...sh it back If this is not possible you should lower the pressure to the pool wall by removing the mixture used to fill up the pool locally again so that the dent can be removed Then carefully fill up...

Page 17: ...skimmer so that the foam side is facing the bottom 3 Install the top skimmer gasket 9 into the square opening of the metal wall make sure that the gas ket is positioned properly in front of the holes...

Page 18: ...proper flexible hose provides the best suction results Attach the free end to the vacu um adaptor 13 2 Switch on the pump Keep the free end of the hose against the outlet of the inlet fixture Because...

Page 19: ...ds or fingers 5 When the cover is in place you can switch on the pump and put into operation the suction of the pool floor 6 When you are finished suctioning you have to switch off the pump Remove the...

Page 20: ...Do not remove the liner from your pool Upon removal of the liner of the pool the warrantee becomes void Do not pump dry all the water from the pool during the winter Leaks found Make sure that there a...

Reviews: