M O N T A G E I N S T R U C T I E C E N T U R Y - P A G I N A 1
Feed towards pump
gate of filter
Check valve
(Recommended)
Space between the top of the pool
and stabilizer sand 22 cm
Grade 2 cm per meter
Stabilisierter Sand
Füllen Sie erst das Schwimmbecken,
bevor Sie den stabilisierten Sand
auffüllen.
PVC tube and fixtures
Valve
(Recommended)
Retour towards
return gate
filter
bility to have easy access for maintenance or repairs.
ATTENTION: If the filling up takes place immediately
around the skimmer, it shall be more difficult in the futu-
re to check the skimmer during leaks.
Doughboy is in no way liable for the expenses pertaining
to the finding and/or repairing of leaks, cutting, breaking
off and/or removing of stabilizing sand.
PREPARATION OF STABILIZER SAND
Mixing ratio 1 m3 fluvial sand with 125 kg concrete.
IMPORTANT WARNING:
Regardless the method used for the way the stabilized
sand is applied, you should pay close attention to the
wall of the pool during filling to be sure that the wall
does not collapse. If a dent occurs in the pool wall,
someone should enter the pool to push it back.
If this is not possible, you should lower the pressure to
the pool wall by removing the mixture
used to fill up the pool locally again so
that the dent can be removed. Then
carefully fill up the pool again. You
should at all times pay attention to the
pool wall until the pool is completely
filled up. To prevent rust on the pool
wall, the water streaming out of the pool
should immediately be removed from the
pool wall. For this you should let the top
layer run off at least 2 cm such as can
be seen from the illustration. After the
mixture has been applied completely,
you should lower the water level to the
top line of the skimmer opening and cut
away the liner in the skimmer opening.
IMPORTANT MESSAGE:
Piling up of loose material between the mixture and the
poor wall may push in the wall. If extra material is placed
between the mixture and the cover material to get this at
the correct height, you should only use a sturdy mortar.
A S S E M B L Y I N S T R U C T I O N S S U N L A K E - O V A L - P A G E 1 6
FIG. 2 SPECIFIC INSTALLATION
FIG.3 - WITH/WITOUT PATIO BLOCKS
Without patio blocks
With patio blocks
Stabilized sand
Keep the stabilized sand 5 cm below
the screw of the guard
Keep the patio blocks 5 cm below
the screw of the guard
Stabilized sand
Top of the
patio block