©
DOSATRON INTERNATIONAL S.A.S /
26
Maintenance
RECOMMENDATIONS
1 - When using soluble products
in solution, periodic dismantling
of the entire dosing assembly is
recommended (refer to:
§ CLEANING THE SUCTION VALVE,
§ REPLACING THE DOSING SEALS).
Rinse the parts of the dosing assembly
section thoroughly with clean mains
water and reassemble them, after
previously lubricating the plunger seal
with a silicone-based lubricant
(Fig.17)
.
2 - Before putting the Dosatron back
into service, remove the motor piston
and soak it in lukewarm water (< 40°C)
[< 104°F] for several hours. This helps
to remove any deposits which may
have dried onto the motor piston.
Seal
Before performing any maintenance on the Dosatron, it is
essential to read the § PRECAUTIONS.
Fig. 17
Summary of Contents for D90GL05BPVF
Page 2: ...D90 GREEN LINE User manual ...
Page 5: ... DOSATRON INTERNATIONAL S A S 4 NOTES ...
Page 26: ... DOSATRON INTERNATIONAL S A S 25 ...
Page 39: ... DOSATRON INTERNATIONAL S A S 38 ...
Page 40: ... DOSATRON INTERNATIONAL S A S 39 Annexes Pressure drop ...
Page 42: ... DOSATRON INTERNATIONAL S A S 41 ...