©
DOSATRON INTERNATIONAL S.A.S /
16
©
DOSATRON INTERNATIONAL S.A.S /
17
Insert the dosing body into the pump
body, taking care to align the centring pins
(Fig.4)
. If necessary, to obtain a clearer
view of the pins, unscrew the dosing
adjustment nut as far as the middle of its
travel.
- Manually retighten the fixing
nut on the dosing assembly
(Fig.5)
.
Fig. 5
Fig. 4
Summary of Contents for D90GL05BPVF
Page 2: ...D90 GREEN LINE User manual ...
Page 5: ... DOSATRON INTERNATIONAL S A S 4 NOTES ...
Page 26: ... DOSATRON INTERNATIONAL S A S 25 ...
Page 39: ... DOSATRON INTERNATIONAL S A S 38 ...
Page 40: ... DOSATRON INTERNATIONAL S A S 39 Annexes Pressure drop ...
Page 42: ... DOSATRON INTERNATIONAL S A S 41 ...