1
About this document
1.1 Content and purpose
This manual is part of the product. The manual
contains important instructions for safe operation.
Therefore, the manual must be carefully read
before using the product. This manual describes
the mounting, commissioning, maintenance and
disassembly of the battery-powered hold-open
system G-Ubivis XEA. The manual’s text section
is supported by figures in the picture section. The
picture numbers in the text can be found at the
bottom left in the figures for the respective chapter.
Not every chapter in the text section has an figure in
the picture section.
1.2 Target group
The hold-open system’s mounting, commissioning,
maintenance and disassembly must only be carried
out by qualified personnel that have been authorized
by dormakaba. The acceptance inspection must only
be carried out by qualified personnel certified for
this by dormakaba. The operation of the hold-open
system may be carried out by any person who is
mentally and physically able of doing so.
1.3 Other applicable documents:
• Operating instructions
• Drilling template
• Information sheet about the use of hold-open
systems
• Building inspectorate approval
1.4 Documents storage
This manual must be kept during the service life of the
product and must be passed on with the product.
Contents
10 Disassembly, recycling and disposal
2
G-Ubivis XEA
2020-11
WN 058974 45532
dormakaba Operating instructions
About this document
1.5 Symbols used
1.5.1 Hazard categories
WARNING
This signal word indicates a situation of
potential risk, which could lead to death or
serious injury if not averted.
CAUTION
This signal word indicates a situation of
potential risk, which could lead to minor or
slight injury if not averted.
ATTENTION
This signal word indicates a situation of
potential risk, which could lead to damage
to property or the environment if not
averted.
1.5.2 More symbols
TIPS AND RECOMMENDATIONS
This symbol indicates useful information for
efficient and trouble-free operation.
1
Displays the image number in the text
1
Image number
2.
1.
Step-by-step figures
1
2
Position numbers of parts
Mounting on the hinge side DIN-L
Mounting on the hinge side DIN-R
Mounting on the opposite side to the
hinge DIN-L
Mounting on the opposite side to the
hinge DIN-R
Pay attention to note in the text
Reference to another manual