background image

 

 

53

24.2

 

Burner cleaning procedure 

The following procedure is recommended for a correct cleaning of the burner: 

 

Summary of Contents for BIOCLASS TR

Page 1: ...INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS TR ...

Page 2: ...nly be carried out by DOMUSA TEKNIK s Authorised Technical Assistance Services Incorrect installation of these boilers could result in damage to people animals or property and the manufacturer will hold no liability in such cases DOMUSA TEKNIK informs all parties concerned that in compliance with section 1 of the first additional provision of Law 11 1997 the responsibility for delivering packaging...

Page 3: ...PERATURE OF THE BUFFER TANK ONLY WITH BUFFER TANK 24 6 6 FUNCTIONING ACCORDING TO OUTDOOR TEMPERATURE CONDITIONS OTC OPTION 24 7 OPERATING WITH BIO HYDRAULIC KITS OPTIONAL 25 8 OPERATION WITH A BT BUFFER TANK OPTIONAL 26 8 1 OPERATION WITH A TEMPERATURE SENSOR IN THE BT BUFFER TANK P 08 1 OR 2 26 8 2 OPERATION WITH A CONTROL THERMOSTAT IN THE BT BUFFER TANK P 08 3 OR 4 27 9 OPERATION WITH A BT DUO...

Page 4: ... 2 PUMPS ANTI LOCK FUNCTION 46 18 3 ANTI FROST FUNCTION 46 18 4 BOILER PRESSURE SENSOR FUNCTION 46 18 5 CONNECTING THE LAGO FB OT REMOTE CONTROL 46 18 6 ROOM THERMOSTAT CONNECTION 47 19 MULTI FUNCTIONAL RELAY P 20 47 19 1 BOILER ALARMS EXTERNAL SIGNAL P 20 1 47 19 2 DHW RE CIRCULATION FUNCTION P 20 2 47 19 3 AUTOMATIC WATER FILLING FUNCTION P 20 3 48 20 CLEANING THE ASH DRAWER 49 20 1 SAFETY WARNI...

Page 5: ...3 30 SPARE PARTS LIST 65 31 ALARM CODES 73 32 GUARANTEE CONDITIONS 76 ...

Page 6: ... 9 13 12 11 10 1 Feed auger 2 Sensor housing 3 Automatic Air vent 4 Flue outlet 5 Fan 6 Heat exchanger cleaning system 7 Water pressure sensor 8 Fuel entrance safety thermostat 9 Heat exchanger 10 Ash drawer 11 Burner 12 Air pressure sensor 13 Peephole ...

Page 7: ... used to restore functioning of the boiler after a lock out situation Also it is used to exit from any of the menus or parameters of the boiler without saving it and to return to the previous menu level 17 ON touch button This button switches on and off the boiler 18 Boiler temperature touch button This button is used to select the boiler set point temperature It is also used to disable the hot wa...

Page 8: ...ted site away from humidity It must be located so that the air grilles on the premises are not obstructed and normal boiler maintenance is possible even if it is placed between items of furniture One metre of free space must be left above the boiler for this purpose 3 2 Hydraulic installation The hydraulic installation must be made by qualified personnel The applicable installation legislation is ...

Page 9: ...for the 3 way DHW diverter valve should be made so that the heating circuit can flow through the valve when it is in rest position not energised HEATING BOILER D H W NC V3V BA OPTIÓN WITH V3V HEATING BC BOILER OPTIÓN WITH 2 PUMP CIRCULATION D H W BA BA NO For correct hydraulic installation of the hot water tank carefully follow the assembly and connection instructions enclosed with the same 3 4 Fu...

Page 10: ...right side of the boiler It is also equipped with adjustable feet for height regulation 2 3 1 5 7a 6 7b 8 4 IMPORTANT Ensure the height of the elliptical holes on the sides of the boiler and on the hopper coincide for correct insertion of the feed auger To do this make the necessary adjustments for height using the adjustment feet and depth correctly positioning the hopper ...

Page 11: ... 20 mbar in compliance with the applicable laws to this regard The combustion product exhaustion ducts must be installed by qualified personnel and must comply with the regulations in force For the flue to create a pressure drop the following recommendations should be taken into account It should be suitably insulated It should be independently located with a separate flue for each boiler It shoul...

Page 12: ...to respect the polarity of the connection The same wire must be connected to the A terminal of the boiler as well as to the A terminal of the hydraulic Kit Same operation with the B terminals as it is shown in the picture below After connecting the communication between the boiler and the hydraulic Kit plug the BIO hydraulic Kit to the main power supply It is recommended to plug the Kit before the...

Page 13: ...a which you can select the installation mode desired The following sections describe in detail the hydraulic and electrical connection characteristics for each installation mode 3 9 1 Installation with Sanit DHW tank after BT tank and control by temperature sensor P 08 1 In this installation mode all heating circuits as well as the circuit for producing DHW by accumulation if present must be hydra...

Page 14: ...tion should be hydraulically connected to the boiler upstream from the BT buffer tank In other words the BT buffer tank and the Sanit DHW tank if present are connected in parallel to the boiler Depending on the type of installation of the DHW tank installation with DHW diverter valve or with a DHW pump the BT tank feed pump Bbt will be installed as indicated in the following hydraulic diagrams The...

Page 15: ...g DHW by accumulation if present must be hydraulically connected to the BT buffer tank In other words as shown in the following hydraulic diagram the BT buffer tank is connected to the boiler interposing a circulation pump Bbt and all the heating circuits of the system are connected to the BT tank The temperature of the BT tank is controlled and managed by a thermostat Tbt installed and immersed i...

Page 16: ...in the following hydraulic diagrams The temperature of the BT tank is controlled and managed by a thermostat Tbt installed and immersed in the buffer tank and electrically connected to the boiler The temperature control thermostat is not supplied by DOMUSA TEKNIK but can be purchased at any specialist central heating supplies warehouse Heating Installation DHW diverter valve Heating Installation D...

Page 17: ... exclusively to managing the heating of the buffer tank Also for correctly managing the DHW production in the tank integrated in the BT DUO tank a DHW temperature sensor supplied optionally must be included in the installation The boiler is supplied with this installation option disabled To enable it the electrical resistance Rbt connected between terminals 18 and 19 of connection strip J7 see Con...

Page 18: ...nect the BT DUO tank feed pump to the component connection strip J2 Bbt terminals N and 7 see Connection Diagram Connect the boiler to the mains power To correctly configure the type of installation you must adjust parameters P 08 y P 09 in the Technician menu on the control panel Access parameter P 08 in the Technician menu see Technician Menu and set the value to 4 Next access parameter P 09 fro...

Page 19: ... have the minimum pressure set at P 19 parameter of Technical Menu by default 0 5 bar a low pressure alarm will appear E 19 IMPORTANT Switching on the boiler with no water inside could result in serious damage 4 4 Initial calibration of the feed auger BioClass TR boiler is equipped with a feed auger to supply the fuel Follow the instructions described in Installing the hopper section to install it...

Page 20: ...er Check the right type of fuel is being used If the installation has flow and return valves check they are open 4 6 Installation delivery After commissioning the Technical Assistance Service will explain to the user how the boiler functions making any observations they consider relevant The installer is responsible for clearly explaining to the user the functioning of any control or regulation de...

Page 21: ...me detected C Timer icons It is displayed when the real time is inside ON programmed period It is displayed when actual time is inside OFF programmed period When any screen is displayed it relates to the display of actual time programming etc D Scale marking bar The meaning can change depending on the parameter displayed Time scale Used to indicate values or settings related to the time and or tim...

Page 22: ... the numerical digits It is displayed when the mixing heating circuit nº 1 demand is activated or when a value or setting related to this circuit is shown by the numerical digits The arrows appear according to the 3 way mixing valve of the circuit activation mode The upper arrow indicates that the hot channel of the valve is opening and the lower arrow indicates that the hot channel of the valve i...

Page 23: ...DHW recirculation pump is switched on It is displayed when the feed auger is switched on and it is displayed blinking when it is in manual operation mode Display of any value or parameter related to the temperature or operation of the buffer tank It is displayed when any of the Menu is in browse mode SET It is displayed when the parameter shown by the numerical digits is adjustable and it is displ...

Page 24: ...ailable if there is a DHW tank installed NOTE When the heating service is disabled they will be disabled all the circuits of the BIO Hydraulic Kit if there is any connected 6 2 Operating with a Sanit DHW tank Option BioClass TR boiler could be installed together with a DHW tank Sanit within the product range offered by DOMUSA TEKNIK to obtain Domestic Hot Water service Follow the instructions desc...

Page 25: ...d depending on the K factor selected The boiler temperature set point parameter only allows to set between activating ON or deactivating OFF the heating service It is possible to disable the heating service of the boiler Summer mode by setting to OFF the boiler temperature set point by pressing symbol for heating 18 6 4 DHW temperature set point selection with DHW tank installed only DHW temperatu...

Page 26: ... When this operation mode is activated the boiler and or heating flow temperature are automatically adjusted in accordance with the K factor curve set at the Technical Menu parameters P 11 and P 12 and the outdoor temperature measured by the outdoor sensor If the installation is correctly dimensioned the boiler temperature and or flow temperature calculated will ensure the room temperature set poi...

Page 27: ... work according to the DHW temperature set point selected on the boiler main board and the temperature read by the DHW sensor Sa installed into the tank In both cases the burner and circulating pump will start operating Bcd of the BIO Hydraulic Kit until the temperature set point is reached in the boiler or in the DHW storage tank Mixing circuit nº 1 functioning The mixing heating circuit No 1 wil...

Page 28: ...t will start up to heat the BT tank The modulating burner of the BioClass TR boiler will keep the water in the buffer tank at the set temperature When the temperature of the tank reaches the selected set point temperature the burner will shut down until its temperature drops to the value set in parameter P 28 by default 5 ºC below that desired once again starting a new heating cycle Regarding the ...

Page 29: ...d Regarding the central heating service of the boiler the circulation pump BC will be activated whenever room thermostat No 1 TA1 or the remote control LAGO FB OT if present demands heating In other words when the room temperature where the thermostat or the remote control is installed is lower than that which is set When the atmosphere reaches the desired temperature and after a time of post circ...

Page 30: ...ntrol LAGO FB OT if present demands heating In other words when the room temperature where the thermostat or the remote control is installed is lower than that which is set When the atmosphere reaches the desired temperature and after a time of post circulation parameter P 15 in the Technician Menu the operation of the heating pump BC will turn off Regarding the operation of the service for provid...

Page 31: ...ng The LAGO FB OT remote control takes over the control of the boiler when it is connected The different selectable temperatures boiler of the boiler must be set at the remote control It is easy to install requiring only 2 wires for communication between the boiler and the LAGO FB OT control by connecting the two wires on terminal strip J5 see Electrical Connection Diagram For a correct installati...

Page 32: ... of User Menu Main position Actual boiler temperature is displayed Ashtray actual fill level see Ashtray status Actual time HH MM DHW temperature set point setting by means of the tactile button 19 DHW tank option only Actual DHW temperature DHW tank option only or Boiler or buffer tank setpoint temperature selected using the corresponding touch button 18 only with buffer tank connected and with c...

Page 33: ...tdoor temperature BIO Hydraulic kit option only Heating circuits demand 11 1 Ashtray status When Ashtray Empty Warning function is activated see Setup menu the boiler warns about the ashtray is full and must be emptied The parameter Ashtray status allows checking the fill level and the screen shows the ash scale bar which indicates the fill level of the ashtray When it is full an Empty the ashtray...

Page 34: ...d press to access and set it When the parameter has been set press again the new value will be saved and the display will return to Setup menu Press RESET any time to go back without recording any value In the following table are listed all the parameters of Setup menu Nº Parameter Display 1 Boiler timer programming 2 DHW recirculation function timer programming DHW tank option only 3 Time setting...

Page 35: ...ayed After setting all the periods desired press to save and return to Setup menu level 12 2 Boiler timer programming This timer is used to adjust the switching on and off periods of the boiler functioning To disable the timer select boiler timer programming and set it to by pressing of the boiler temperature touch button 18 The boiler timer will be cancelled and it will be switched on permanently...

Page 36: ...access The first two digits of numerical digits blinks hours and setting process begins Set the hour value by pressing or of DHW 19 Pressing the value is saved and the minutes digits blinks to set them Set the minutes value by pressing or of DHW 19 Pressing the value is saved and it returns to Setup menu level ...

Page 37: ... depending of boiler model Model Fuel Kg BioClass TR 10 650 kg BioClass TR 16 750 kg BioClass TR 25 1000 kg Select Ashtray empty warning parameter of Setup menu and press to access The value is set by pressing and symbols of DHW 19 It is possible to deactivate this function by setting the value of this parameter to OFF NOTE Each time a new value is set for this parameter the ashtray must be emptie...

Page 38: ...symbols or of heating 18 When the desired parameter is displayed press to access and set it When the parameter or process has been set press again the value will be saved and the display will return to Calibration menu Press RESET any time to go back without recording any value In the following table are listed all the parameters and processes included in Calibration menu Nº Parameter Display 1 Fe...

Page 39: ... activated filling procedure The feed auger will be activated and a count up to 15 minutes maximum will be displayed During the process by pressing the feed auger could be stopped at any time and by pressing RESET the filling procedure could be finished and return to Calibration Menu at any time To ensure a complete filling of boiler feed auger it is recommended to make a complete 15 minute proced...

Page 40: ... fuel of the same quality and size When Feed auger calibration parameter is displayed on Calibration Menu press to access SET symbol blinks and pressing again it will be activated calibration procedure The feed auger will be activated and a countdown from 200 doses will begin When the countdown finishes current calibration value will be displayed press to adjust the new value obtained during the p...

Page 41: ... to access SET symbol blinks and pressing again the circulation pumps will be activated for a period of not more than 20 minutes By pressing the circulation pumps can be stopped at any time and by pressing RESET it will return to Calibration Menu level 14 TECHNICAL MENU Technical Menu consists of a number of technical operating parameters that only have to be modified by a person with sufficient t...

Page 42: ...3 Maximum boiler heat output P 04 General fan speed factor P 05 Fuel for ignition g P 06 Fuel consumption kg h P 07 Fuel type P 08 Selecting the type of installation for the BT buffer tank Only with buffer tank installed P 09 DHW installation mode DHW tank option only P 10 OTC operating mode Bio Hydraulic kit option only ...

Page 43: ...imum temperature mode P 14 Minimum boiler temperature ºC P 15 Heating pump post circulation time min P 16 DHW pump post circulation time min DHW tank option only P 17 Legionella protection function DHW tank option only P 18 Boiler s pump operating mode BC P 19 Minimum boiler water pressure bar P 20 Multifunction relay P 21 Automatic water filling pressure bar P 20 3 option only ...

Page 44: ...draulic Kit Bio P 28 BT buffer tank temperature hysteresis Only with buffer tank installed 14 1 Entry and set the access code cod P 25 When the access code request is displayed or to set a new one P 25 press to access SET symbol blinks and it would be possible to enter the code or set it Press the o for heating symbols 18 to browse trough the digits and press the o for DHW symbols 19 to set each d...

Page 45: ...ans of parameter P 04 the fan speed percentage may be set in order to increase or decrease the combustion air quantity and ensure a correct combustion Changing its value affects the fan speed percentage for the entire modulation curve If it is set below 100 the air quantity will decrease and if it is set a higher value the air quantity will increase The range of values selectable is 0 200 by defau...

Page 46: ...of fuel used The range of values selectable is 0 000 99 99 kg h and the default value depends on the model of boiler and the type of fuel set 15 9 Boiler minimum temperature mode P 13 P 14 By means of parameters P 13 and P 14 a different mode of temperature managing may be set by default P 13 2 if heating or and DHW services are enabled When parameter P 13 is set to 0 by parameter P 14 the minimum...

Page 47: ...lic Kit By means of parameter P 27 the maximum heating flow temperature may be set The range of values selectable is 45 80 ºC by default 45 ºC for mixed circuits 17 DHW CIRCUIT S SETUP PARAMETERS BioClass TR is equipped with an electronic controller to regulate a Domestic Hot Water production service if a DHW tank is connected to the boiler The following parameters are used to set the parameters r...

Page 48: ...circulating pumps from locking if they have been out of use for a long period of time This system remains enabled while the boiler is plugged into the mains 18 3 Anti frost function This function protects the boiler from freezing during cold weather periods If the boiler temperature drops below 6 ºC the heating pump will start running until the boiler temperature reaches 8 ºC If the boiler tempera...

Page 49: ...tional relay function The default value of this parameter is 0 disabled The following sections describe the functions that could be set 19 1 Boiler alarms external signal P 20 1 When this function is selected P 20 1 if the boiler shows an error or an operating alarm code the multi functional relay output will be activated supplying voltage 230 V between terminals no 4 NO and N of the terminal stri...

Page 50: ...ti functional relay output between the terminals No 4 NO and N of the terminal strip J3 see Connections diagram The hydraulic installation and electrical connection of the automatic water filling system must be made by qualified personnel If the function is enabled P 20 3 the electronic controller of the boiler will active the multi functional relay output supplying voltage 230 V between the termi...

Page 51: ...taken into account Switch off the boiler before taking out the ash drawer It is recommended to take out the ash drawer when no flame is detected in the burner It is recommended to wear insulating thermal gloves to protect your hands from any burns from hot parts of the drawer It is recommended you wear a protective mask to avoid breathing in any ash particles particularly in the case of people wit...

Page 52: ...will appear on the screen The burner will switch off and stop heating the installation This lock out occurs when the temperature of boiler s water exceeds 110 ºC To unlock it wait until the temperature drops below 100 ºC and press the button of the safety thermostat located underside of the electrical case of the boiler after having removed the button cover 21 2 Fuel entrance tube overheat safety ...

Page 53: ...gain see Filling the installation up to 1 or 1 5 bar displayed on Water pressure parameter of User menu 22 SHUTTING DOWN THE BOILER Press during 1 second to shut down the boiler When the boiler is shut down the heating and DHW services are switched off but anti frost and pumps anti lock functions continue activated whereas the boiler is kept connected to the power supply and fuel installation Unpl...

Page 54: ...ly weekly 4 Check if the feed auger is correctly calibrated as required 5 Check and clean the boiler fume circuit yearly 6 Check and clean the chimney The chimney must be free of any obstacles and have no leaks yearly 7 Clean the burner yearly 8 Check the expansion vessel It must be full according to its data plate yearly 9 Check the seal between the burner and the boiler yearly 10 Check if the hy...

Page 55: ...53 24 2 Burner cleaning procedure The following procedure is recommended for a correct cleaning of the burner ...

Page 56: ...BioClass TR 54 24 3 Heat exchanger cleaning procedure The following procedure is recommended for correctly cleaning the heat exchanger ...

Page 57: ...ating installation to avoid any scale deposits on the boiler It should be noted that even a few millimetres of scale will greatly reduce the boiler s heat conductivity causing a major drop in performance Treated water must be used in the heating circuit in the following cases Very large circuits containing a large amount of water Frequent filling of the installation If it is necessary to drain par...

Page 58: ...A B C D BioClass TR 25 1310 670 E O 150 240 755 1045 935 915 A C D VS IC IC RC SH V B Dimensions mm IC RC A B C D E BioClass TR 10 150 260 340 440 BioClass TR 16 1 F 120 225 300 400 IC Heating flow RC Heating return SH Fume outlet V Drainage cock VS Pressure relief valve 1 2 F BioClass TR 25 1 1 4 F 145 235 415 515 820 ...

Page 59: ...57 S Hopper L Hopper ...

Page 60: ...emovable Hopper S Hopper L Hopper Removable Hopper PC Size PC Size PC Size BioClass TR 10 93 162 66 BioClass TR 16 58 101 42 BioClass TR 25 37 300 litres 65 520 litres 27 215 litres PC Combustion period in hours at QN ...

Page 61: ...alve NO Multi functional relay NC Multi function relay TA1 Room thermostat Sc Boiler temperature sensor Ra Sa DHW tank option resistance Rbt Sbt Resistance for BT tank Option RT Remote relay Sv Fan speed sensor J1 Power supply connector J2 Component connector J3 Component connector J4 Communication connector J5 LAGO FB OT remote control connector J6 Room thermostat connector J7 Sensors connector ...

Page 62: ...0 26 2 Burner Qout Burner outputs connector R Ignition heater LC Burner ash cleaning device FC1 Closed switch FC2 Open switch Qin Burner inputs connector FCq Burner switch FR Photocell FCp Ash cleaning device switch ...

Page 63: ...y thermostat TE Fuel entrance safety thermostat Cv Fan capacitor SPW Water pressure sensor SPA Air pressure sensor Qout Burner outputs connector Qin Burner inputs connector LCD Display communication connector J4 Communication connector S1 S2 Boiler model DIP switch ...

Page 64: ...3 25 25 20 CO at minimum heat output 10 O2 mg m3 250 460 240 OGC organic gaseous substances at minimum heat output 10 O2 mg m3 15 20 5 Boiler class according to EN 303 5 Class 5 Maximum operating pressure bar 3 Maximum operating temperature ºC 110 Water volume l 46 55 73 Minimum flue draught mbar 0 10 Maximum flue draught mbar 0 20 Electrical supply 230 V 50 Hz 1 5 A Boiler chimney diameter mm 125...

Page 65: ... diagrams show three curves what correspond to the three speeds of the circulation pump NYL 43 25 0 1 2 3 4 5 6 7 0 0 5 1 1 5 2 2 5 Q m 3 h H m III II I NYL 53 25 0 1 2 3 4 5 6 7 0 0 5 1 1 5 2 2 5 3 3 5 Q m 3 h H m III II I 29 2 High efficiency circulation pump The high efficiency circulation pump allows savings of up to 70 in energetic consumption in comparison to conventional pumps The pump can ...

Page 66: ...the pump is adjusted to the appropriate setpoint value of differential pressure Min As well as the hydrodriving pressure of the pump it is essential to consider the pressure drop of the installation to assure the correct sizing up of the hydraulic installation The following diagram shows the pressure drop for each model of BioClass TR boiler Pressure drop 0 1 2 3 4 5 6 7 0 0 5 1 1 5 2 2 5 Q m3 h H...

Page 67: ...65 30 SPARE PARTS LIST Boiler 1 2 4 5 3 6 7 8 9 10 11 13 12 14 15 16 19 20 21 22 23 24 25 27 28 29 31 35 32 38 39 37 41 44 45 30 33 34 40 42 43 17 26 36 18 ...

Page 68: ...Air pressure sensor protection 24 CELC000331 Air pressure sensor 25 SEPO001770 Air pressure sensor support 26 CFER000220 Latch 27 RBIO000023 Door BioClass TR 10 16 RBIO000024 Door BioClass TR 25 28 RBIO000025 Lower door BioClass TR 10 16 RBIO000026 Lower door BioClass TR 25 29 SEPO002203 Lower door shaft 30 MVAR240116 DIN 6798 A M4 washer 31 MVAR240156 DIN 933 M4X10 screw 32 SEPO002194 Stiffness B...

Page 69: ...ner 1 2 3 4 5 6 8 7 9 10 11 12 13 14 23 18 19 20 24 25 26 27 28 29 30 31 33 32 35 36 37 38 39 34 41 42 43 33 44 45 46 47 48 49 50 51 52 62 53 61 54 55 56 57 58 12 14 15 16 17 21 22 22 22 63 64 33 59 60 40 65 ...

Page 70: ...on cover 25 36 CFOV000135 Motor 37 SCON001322 Burner body 10 SCON001326 Burner body 16 SCON001327 Burner body 25 38 RCON000001 Combustion chamber sub unit 10 16 RCON000002 Combustion chamber sub unit 25 39 RCON000020 Olive stone burning kit 10 16 RCON000021 Olive stone burning kit 25 40 CTOR000223 DIN 125 A2 M6 INOX washer 41 CTOR000222 DIN 933 M6x16 INOX screw 42 CTOR000226 Blind rivet nut 43 SCH...

Page 71: ...R000084 DIN 125 A M6 washer 11 CTOE000172 Cam system washer 12 CFER000129 Bearing 13 CTOR000230 Self locking hex nut 14 SCON000305 Outer plate sub unit 10 16 SCON000306 Outer plate sub unit 25 43 15 CFER000292 Elastic pin 16 CTOR000218 DIN 913 M6x10 stud Nº Code Name 17 SCON000307 Transmission crank sub unit 18 CFOV000140 YN 60 capacitor BioClass HM 10 16 25 CFOV000141 YN 70 capacitor BioClass HM ...

Page 72: ...W motor transmission 1 180 2 CFOV000142 YN 80 capacitor 3 SEPO001637 Fixing plate 4 SCON000578 Feed Screw 10 16 SCON000579 Feed Screw 25 5 SEPO001611 Feed tube 10 16 SEPO001612 Feed tube 25 6 CFER000019 Clamp 7 STUR000004 Polyurethane flex hose TR 10 16 25 ...

Page 73: ...4 Display fixing 5 REBI336XXX Display card BioClass TR 6 SEPO001304 Drawer cover 7 SEPO002185 Drawer BioClass TR 10 16 SEPO002212 Drawer BioClass TR 25 8 CELC000234 Boiler sensor 9 SEPO001740 Kit aspiration TR cover 10 SCHA009150 Ground plate 11 REBI335XXX Supply electronic card BioClass TR 12 CFOV000121 Fan motor capacitor BioClass TR 10 CFOV000133 Fan motor capacitor BioClass TR 16 25 13 CELC000...

Page 74: ...rd Nº Code Name 1 CELC000343 Communication cable 2 CELC000353 Thermostat cable 3 CMAZ000123 Wiring harness 4 CELC000344 Burner output cable 5 CELC000345 Air pressure sensor cable 6 CELC000348 Burner input cable 7 CELC000349 Water pressure sensor cable ...

Page 75: ...ash cleaning system final step error E 09 Burner ash cleaning system switch error FCp These alarms occur when a bad running of the burner ash cleaning system is detected If this alarm occurs repeatedly contact the nearest official technical assistance service E 10 Boiler water overheating The water in the boiler has exceeded the safety temperature of 100 ºC The boiler will lock out The boiler will...

Page 76: ...r pressure sensor The burner will be locked until the depression is correct again If this alarm occurs repeatedly contact the nearest official technical assistance service E 25 Wrong calibration data The calibration data is wrong or it is set at OFF value If this alarm occurs repeatedly contact the nearest official technical assistance service E 26 Communication error with CVS Suction System Commu...

Page 77: ...c Kit If this alarm occurs repeatedly contact the nearest official technical assistance service E 43 Ashtray full Warning that the ashtray is full The boiler will continue operate normally To restore warning the ashtray must be emptied and it is necessary to set the Emptying ashes parameter to 0 of the User menu See Ashtray status E 44 Boiler Maintenance Notice for maintenance of the boiler Contac...

Page 78: ...ot included in the terms of this guarantee 3 The commissioning and annual overhaul are to be carried out by personnel authorised by DOMUSA TEKNIK 4 The commercial guarantee will be null and void in the following cases If the annual overhaul by personnel authorised by DOMUSA TEKNIK has not been carried out If the boiler has not been installed in accordance with the applicable laws and regulations f...

Page 79: ...NOTES ...

Page 80: ... Bº San Esteban s n Ellesmere Port CH65 9BF 20737 ERREZIL Gipuzkoa Tel 0151 909 6222 Tel 34 943 813 899 www domusateknik com DOMUSA TEKNIK reserves the right to make modifications of any kind to its product characteristics without prior notice CDOC001503 CDOC001503 09 16 ...

Reviews: