BioClass HC
14
5.5
Commissioning
In order for the
guarantee to be valid
, the boiler must be commissioned by
personnel authorised
by DOMUSA TEKNIK
. Before beginning the commissioning, the following must be complied with:
- The boiler must be plugged in to the mains.
- The installation must be filled with water (the pressure must be between 1 and 1.5 bar).
- The hopper must be filled with fuel.
The commissioning sequence is as follows:
- Check the flue is correctly installed using a condensation inspection tap and a draught
stabiliser.
- Check the hopper and the feed auger are correctly installed.
The feed auger must be
calibrated for a correct boiler functioning
(See
“Calibrating the feed auger”
). Check the right
type of fuel is being used (wood pellet must be
DIN PLUS
).
- If the installation has flow and return valves, check they are open.
5.6
Installation delivery
After commissioning, the Technical Assistance Service will explain to the user how the boiler
functions, making any observations they consider relevant.
The installer is responsible for clearly explaining to the user the functioning of any control or
regulation device forming part of the installation but not supplied with the boiler.