Cable Size
Heatless DX Models
Recommended cable rating for 240V/1ph/ 50Hz supply is 1.5mm
2
.
Heat Regenerative DH Models
Important Notice:
Due consideration should be given to voltage drop when sizing electrical supply cables.
Voltage at the dryer must be b5% to -10%. Wiring must be in accordance with the latest edition IEE wiring
regulations or equivalent local standards.
POWER CONSUMPTION - HEAT REGENERATIVE
F) Electrical Connection Heatless DX Models
Open control shroud and identify location of Electric Cam Timer.
Feed supply cable through cut outs provided in instrumentation shroud support bracket, allowing adequate cable
for connection.
Remove electric cam timer cover and feed cable through gland in the side of the Electric Cam Timer enclosure.
Connect 240V/1 ph/50hz supply to the terminal blocks provided.
For other voltages, refer to diagram printed on the inside of the enclosure.
HEATLESS ELECTRICAL CAM TIMER ENCLOSURE
FULL LOAD AMPS
POWER CONSUMPTION
MODEL
A
KWh AVERAGE
COLUMNS
DH 40
7.2
1.1
2
DH 80
14.4
2.2
4
DH 120
21.6
3.3
6
DH 160
28.8
4.4
8
DH 190
36.0
5.5
10
Summary of Contents for PNEUDRI DH Series
Page 2: ......
Page 17: ...15 FIGURE 1 TYPICAL HEATLESS DRYER CUTAWAY 1 9 10 11 12 8 3 7 2 6 4 5 CONSTRUCTION...
Page 18: ...16 FIGURE 2 TYPICAL HEAT REGENERATIVE CUTAWAY 1 9 10 11 12 8 3 7 2 6 13 4 5 CONSTRUCTION...
Page 19: ...17 FIGURE 3 HEATLESS CONTROL ELECTRIC CAM SCHEMATIC...
Page 20: ...18 FIGURE 4 HEATLESS CONTROL PNEUMATIC CAM SCHEMATIC...
Page 21: ...19 FIGURE 5 HEAT REGENERATIVE CONTROL SCHEMATIC...
Page 22: ...20 FIGURE 6 PURGE EXHAUST AIR DRAINAGE...
Page 47: ...45 ABBILDUNG 1 SCHNITTBILD KALTREGENERIERTER TROCKNER 1 9 10 11 12 8 3 7 2 6 4 KONSTRUKTION 5...
Page 48: ...46 ABBILDUNG 2 SCHNITTBILD WARMREGENERIERTER KONSTRUKTION 1 9 10 11 12 8 3 7 2 6 13 4 5...
Page 49: ...47 ABBILDUNG 3 SCHALTPLAN DES ELEKTRISCHEN CAM TIMERS KALTREGENERIERTER TROCKNER...
Page 50: ...48 ABBILDUNG 4 SCHALTPLAN DES PNEUMATISCHEN CAM TIMERS KALTREGENERIERTER TROCKNER...
Page 51: ...49 ABBILDUNG 5 SCHALTPLAN WARMREGENERIERETER TROCKNER...
Page 52: ...50 ABBILDUNG 6 ABLASSLEITUNG F R SP LLUFT ABLUFT...
Page 78: ...76 FIGURE 1 SECHEUR A REGENERATION SANS CHALEUR CONSTRUCTION 1 9 10 11 12 8 3 7 2 6 4 5...
Page 79: ...77 FIGURE 2 SECHEUR A REGENERATION THERMIQUE CONSTRUCTION 1 9 10 11 12 8 3 7 2 6 13 4 5...
Page 80: ...78 FIGURE 3 SCHEMA DU CIRCUIT DE REGULATION SANS CHALEUR PROGRAMMATEUR ELECTRIQUE...
Page 81: ...79 FIGURE 4 SCHEMA DU CIRCUIT DE REGULATION SANS CHALEUR PROGRAMMATEUR PNEUMATIQUE...
Page 82: ...FIGURE 5 SCHEMA DU CIRCUIT DE REGULATION A REGENERATION THERMIQUE 80...
Page 83: ...FIGURE 6 VIDANGE D AIR DE PURGE ECHAPPEMENT 81...
Page 108: ...106 FIGURA 1 SIN CALOR 1 9 10 11 12 8 3 7 2 6 4 5 CONSTRUCCI N...
Page 109: ...107 FIGURA 2 REGENERACI N POR CALOR 1 9 10 11 12 8 3 7 2 6 13 4 5 CONSTRUCCI N...
Page 110: ...108 FIGURA 3 ESQUEMA DE LEVA EL CTRICA DE CONTROL SIN CALOR...
Page 111: ...109 FIGURA 4 ESQUEMA DE LEVA NEUM TICA DE CONTROL SIN CALOR...
Page 112: ...110 FIGURA 5 ESQUEMA DE CONTROL DE REGENERACI N POR CALOR...
Page 113: ...111 FIGURA 6 PURGA ESCAPE DESCARGA DE AIRE...
Page 136: ......