28
- By applying firm pressure to the clamp, snap the heating element onto the
boiler.
(Figure 105)
- Position element, adjust its position. The element must be positioned in the
direction of hinge, and its upper edge must be ~ 85 mm from the lower
edge of the plate holding the aggregate
(see: spare parts exploded
view).
- Reinsert
boiler-insulation
(see 2.3.3)
- Reinsert boiler-insulation cover, bend back blocking tabs.
(Figure 106)
- Reinsert temperature controller
(see 2.3.4).
- Snap back wire clamp of heater element.
(Figure 107)
- Reassemble loosened end of hinge
(see 2.2.3).
- Check electrical insulation resistance according to
2.3.3.
Figure 105
Figure 106
Figure 107