
40
999775002 - 02/2020
Operating the climbing formwork
User Information
Climbing formwork 150F
3rd casting section
➤
Prepare the suspension points.
➤
Dismount the 'Wind bracing'.
➤
Attach the lifting chain to the lifting-brackets of the
Vertical waling.
➤
Remove the fastening bolts (= lift-out guard) from the
suspension points.
➤
Loosen the fixing-nuts of the climbing cones using a
Reversible ratchet 1/2" and Box spanner 41.
➤
Lift the working platform to the pre-assembled sus-
pended platforms.
➤
Mount the suspended platform, working from a
mobile scaffold tower.
➤
Bolt on the inside suspension tube with an M
16x120
hexagon bolt.
NOTICE
➤
When loosening the fixing-nuts, take care
not to undo the climbing cone itself.
9775-247-02
9775-223-01
9775-224-01
9775-254-02
Summary of Contents for 150F
Page 2: ...2 999775002 02 2020 User Information Climbing formwork 150F ...
Page 26: ...26 999775002 02 2020 Anchoring on the structure User Information Climbing formwork 150F ...
Page 34: ...34 999775002 02 2020 Repositioning User Information Climbing formwork 150F ...
Page 52: ...52 999775002 02 2020 Assembly User Information Climbing formwork 150F ...