
User Information
Climbing formwork 150F
Anchoring on the structure
23
999775002 - 02/2020
➤
Tilt the fastening pin downward.
The climbing bracket is now secured against acci-
dental lift-out.
➤
Tighten the fixing-nuts of the climbing cones using a
Reversible ratchet 1/2" and Box spanner 41.
Dismounting the suspension point
➤
Unscrew the climbing cone with a Reversible ratchet
1/2".
Sealing the suspension point
Grout level with the rest of the surface
Sealing of the suspension points can be a requirement,
for reasons of rust prevention.
➤
Fill the cavity of the suspension point with mortar and
grout it smoothly.
Fibre concrete plugs
➤
Remove the sealing sleeve.
➤
Glue the fibre concrete plug into the hole of the sus-
pension point.
The concrete plug is glued into place with standard
concrete adhesive.
C
Fastening pin
The fastening pin must be pointing vertically
downward!
D
Fixing nut
9775-230-02
C
9775-230-03
9775-230-04
D
A
Climbing cone 15.0 5cm
B
Fibre concrete plug 30.7mm
9775-22 -0
8 1
A
B
9 -
775 269-19
Summary of Contents for 150F
Page 2: ...2 999775002 02 2020 User Information Climbing formwork 150F ...
Page 26: ...26 999775002 02 2020 Anchoring on the structure User Information Climbing formwork 150F ...
Page 34: ...34 999775002 02 2020 Repositioning User Information Climbing formwork 150F ...
Page 52: ...52 999775002 02 2020 Assembly User Information Climbing formwork 150F ...