38
999775002 - 02/2020
Operating the climbing formwork
User Information
Climbing formwork 150F
➤
Fix the pre-assembled formwork to the vertical wal-
ings with waling-to-bracket holders.
➤
Fix timber wedges in the multi-purpose walings (for
better load-transfer in the area around the adjusting
spindles).
➤
Adjust dimension 'b' as per shop drawing / assembly
plan, using the adjusting spindle (see the section
headed 'Plumbing & aligning the formwork').
➤
Insert guardrail boards and use nails to secure them
to the handrail-post plates.
Add provisions to safeguard improper lifting and
repositioning of the unit as one piece.
➤
e.g. nail on a board in such a way that the crane lift-
ing tackle cannot be hung into place in the lifting
bracket.
Waling-to-bracket holder
Waling-to-bracket holder 9-
15cm
H ... permitted horizontal load: 11
kN
H ... permitted horizontal load: 22
kN
A
Waling-to-bracket holder 9-15cm
B
Height-adjusting spindle
C
Timber wedges
98016-216-05
H
98016-216-04
H
9775-259-01
A
B
C
C
B
A
b
9766-301-01
WARNING
➤
Any
lifting brackets
on the formwork pan-
els, or
Framax lifting hooks
, must
not
be
used for lifting the unit as a whole.
➤
Attach the crane lifting tackle to the lifting
brackets of the vertical waling.
9715-268-01
9775-281-01
9775-247-02
97 - -02
15 275
Summary of Contents for 150F
Page 2: ...2 999775002 02 2020 User Information Climbing formwork 150F ...
Page 26: ...26 999775002 02 2020 Anchoring on the structure User Information Climbing formwork 150F ...
Page 34: ...34 999775002 02 2020 Repositioning User Information Climbing formwork 150F ...
Page 52: ...52 999775002 02 2020 Assembly User Information Climbing formwork 150F ...