
User Information
Climbing formwork 150F
Anchoring on the structure
19
999775002 - 02/2020
Preparing the positioning point
Preparing the positioning point
➤
Push the sealing sleeve all the way onto the position-
ing cone.
Note:
Do not screw the stop anchor in until the sealing sleeve
is pushed fully on to the positioning cone.
b ... 10
mm
c ... 10
mm
WARNING
Sensitive anchoring, suspension and connec-
tor components!
➤
Never weld or heat these components.
➤
Any components that are damaged or weak-
ened by corrosion or wear must be with-
drawn from use.
9775-269-09
9775-269-10
9775-269-11
A
Positioning cone 15.0
5cm
B
Sealing sleeve 15.0 5cm (orange)
WARNING
➤
Always screw the stop anchor into the posi-
tioning cone until it fully engages.
Not screwing the stop anchor fully into the
cone may lead to reduced load-bearing
capacity and failure of the suspension point
– resulting in possible injury and/or damage.
C
Stop anchor 15.0 (expendable anchoring component)
D
Depth mark
▪
Always screw in components until they are
fully engaged. When correctly fitted, there
will still be 10 mm of thread visible
between the part and the depth mark on
the stop anchor or pigtail anchor.
b ... > 10
mm not permitted
▪
The sealing sleeve must be completely
pushed onto the positioning cone.
c ... > 10
mm not permitted
9715-246-01
B
A
c
b
C
D
9775-269-16
9775-269-14
b
9775-269-15
c
Summary of Contents for 150F
Page 2: ...2 999775002 02 2020 User Information Climbing formwork 150F ...
Page 26: ...26 999775002 02 2020 Anchoring on the structure User Information Climbing formwork 150F ...
Page 34: ...34 999775002 02 2020 Repositioning User Information Climbing formwork 150F ...
Page 52: ...52 999775002 02 2020 Assembly User Information Climbing formwork 150F ...