FLOWMETER PLUMBING
The FM-1008.5-
LED is shipped with a 20’ length of ¼” ID X 3/8” OD hose, Part #451-20, for
the pump output. This hose will route to the FM-1008.5-LED Flowmeter and continue on from
the FM-1008.5-LED Flowmeter to the cutter head.
1.
Route the ¼” ID X 3/8” ID hose, Part #451-20, from
the pump unit up to the FM-1008.5-LED Flowmeter and
cut the hose to the appropriate length for installation
into the compression fitting, Part #JACO18MPT38OD,
on the
BOTTOM
. Make a clean
SQUARE
cut to
assure proper sealing.
2.
Loosen
–
DO NOT REMOVE
- the bottom
compression nut and insert the cut end into the fitting
until it stops. Tighten the fitting to assure a proper seal.
Hand tightening is usually fine.
3.
Loosen the
TOP
compression nut
–
DO NOT
REMOVE
– and insert the cut end into the fitting until it
stops. Tighten the fitting to assure a proper seal.
Again, hand tightening is usually fine.
REMEMBER: The hose runs from the pump into the bottom fitting, then out of the
top fitting to the application point.
FLOW
IN
FROM
PUMP
FLOW
OUT
TO
DISCHARGE
#JACO18MPT38
OD