26
5.
Works to be carried out inside or close to tanks, equipments, pits, pipes,
dismantled plant components, in narrow rooms etc. Further precautions.
□
a. Transit permit…………………………………………No..……………………………..dtd……………………………………
□
b. Work permit………………………………………….. No.……………………………..dtd………….…………………………
□
c. Safety documentation for electric systems………..No………………………………dtd…………………………
□
d……………………………………………………………………………………………………………………………………………………
6.
□
a. Daily notification of work beginning in case of B1, 2, 3,4 …………………………………………………
□
b. Daily notification of work end in case of B1, 2, 3, 4 …………………………………………………………..
7.
□
a. Control of the safety measures marked by (name) ……………………………………………………………..
□
b. Check of the building site at the work end by (name)………………………. ………………………………..
D Agreement about responsibility concerning dangerous areas
Work beginning notification……………………….dtd…………………………….by………………………………………..
For B1 safety measure C point …………………………………………………………………………………………………..
For B2 safety measure C point …………………………………………………………………………………………………..
For B3 safety measure C point …………………………………………………………………………………………………..
For B4 safety measure C point …………………………………………………………………………………………………..
Permit issued on ………………………………………………… …………………………………………………………………….
Date
Company Director Signature