
C L 1 U S E R S G U I D E
D O D T E C H N O L O G I E S , I N C
Rev 10.07
Page 6
Chapter 3 - Installation
3.1 Selecting a location
The CL1 should be placed in a location as central as possible to the locations being monitored
while considering the following restrictions:
♦
The maximum sample line length is 150 ft. for all gases other than Diisocyanates.
♦
Diisocyanates have a 6” maximum sample line
♦
Using the shortest possible sample line length will reduce transport times and increase
the response time of the CL1.
♦
A/C power is required to the unit.
♦
Locate near proper ventilation keeping in mind the maximum length of the exhaust
tubing is 25ft.
♦
The CL1 requires stable temperature and humidity levels within range to operate
properly.
3.2 Mounting
Refer to figure 3.1 for dimensional requirements for wall mount. Be sure the CL1 is properly
secured to the wall.