v.211220
| 25
OPERATION
ENGINE START-UP
(AFTER STORING FOR LONG PERIODS OF TIME)
STEP 5 • 5:
TURN OFF
(LEFT)
THE AIR VALVE CHOKER BEFORE STARTING
THE ENGINE, AFTER ENGINE START, TURN IT BACK ON
(RIGHT)
.
STEP 5 • 6:
BEFORE STARTING THE ENGINE, PLACE THE THROTTLE LEVER
ON THE LEFT POSITION.
(LEFT = THROTTLE DECREASE, RIGHT = THROTTLE INCREASE)
OFF
ON
MAX
MIN
ENGLISH
Summary of Contents for OPV425
Page 4: ...SECTION I SAFETY...
Page 12: ...SECTION II OPERATION...
Page 31: ...SECTION III PARTS SCHEMATICS...
Page 40: ......
Page 44: ...SECTION I S CURIT...
Page 53: ...SECTION II OP RATION...
Page 72: ...SECTION III PI CES SCH MAS...