background image

L2211  Rev. O

1/97

Instruction Sheet

HPH14 Installation

®

Figure 1 – Pump (without aluminum handle)

Figura 1 – Bomba (sin mango de aluminio)

Figure 1 – Pompe (sans levier aluminium)

Abbildung 1 – Pumpe (ohne Aluminiumgriff)

Figura 1 – Pompa (senza manico di alluminio)

Afbeelding 1 – Pomp (zonder aluminium handvat)

Figure 2 – Pump (with aluminum handle)

Figura 2 – Bomba (con mango de aluminio)

Figure 2 – Pompe (avec levier aluminium)

Abbildung 2 – Pumpe (mit Aluminiumgriff)

Figura 2 – Pompa (con manico di alluminio)

Afbeelding 2 – Pomp (met aluminium handvat)

Aluminum Handle (HPH14) Installation

1.

Place and hold the pump on a flat and level horizontal surface.

2.

While holding the end cap in position to prevent loss of oil, remove the acorn nut, o-ring, and washer. (See
figure 1.) 

3.

Install the new o-ring and washer.

4.

Loosely assemble the aluminum handle onto the reservoir tie rod.

5.

Torque the aluminum handle to 12-15 ft-lbs. (16-20 Nm).

Note: Hold the pump on a flat surface to keep the pump’s feet straight.

6.

Position the foam grip over the aluminum handle and push firmly.

Hoja de instrucciones
Instalación de HPH14

Instalación de mango de aluminio (HPH14)

1.

Coloque y sujete la bomba en una superficie plana y horizontal.

2.

Mientras se sujeta la tapa terminal en posición para evitar la pérdida de aceite, quite la tuerca ciega, el 
anillo "O" y la arandela. (Vea la Figura 1.)

3.

Instale el anillo "O" y la arandela nuevos.

4.

Coloque el mango de aluminio sin apretarlo en la barra de fijación del depósito.

5.

Apriete el mango de aluminio a 16-20 Nm (12-15 lb-pie).

Nota: Sostenga la bomba sobre una superficie plana para mantener las patas de la
bomba rectas.

6.

Coloque la empuñadura de espuma sobre el mango de aluminio y empújela firmemente.

Reviews: