INSPECTING THE LIFT
Lifting and hoisting equipment used at construction sites should always be inspected before use.
The lift should be inspected periodically, at least once a week during the work period. If defects are
discovered, they should be noted in a logbook and reported to the foreman.
FIRST INSPECTION
The Dino lifts are subjected to a first inspection and load test at the manufacturer.
The results are noted in a protocol that accompanies the lift.
Summary of Contents for Dino 180XT
Page 2: ...DINO 180XT 2...
Page 3: ...DINO 180XT 3 OPERATION INSTRUCTIONS Valid from serial number 18154...
Page 6: ...DINO 180XT 6 REACH DIAGRAM m kg...
Page 8: ...DINO 180XT 8 REACH DIAGRAM ft lbs...
Page 14: ...DINO 180XT 14 LIMIT SWITCHES RK4 AND RK5 PRESSURE SPRING LINK LIFT CYLINDER...
Page 16: ...DINO 180XT 16...
Page 20: ...DINO 180XT 20 Notes...
Page 22: ...DINO 180XT 22...
Page 24: ...DINO 180XT 24...
Page 40: ...DINO 180XT 40 LUBRICATION PLAN...
Page 42: ...DINO 180XT 42 1...
Page 55: ...DINO 180XT 55...
Page 86: ...DINO 180XT 86 ELECTRIC SCHEMA 110 230VAC 18094...
Page 92: ...DINO 180XT 92 ELECTRIC SCHEMA 12VDC 230VAC DIESEL AGGREGATE 18154 18222 18226 18228 PRC 26A...
Page 94: ...DINO 180XT 94 Notes...
Page 95: ...DINO 180XT 95 ELECTRIC SCHEMA PETROL GASOLINE AGGREGATE 18069...
Page 96: ...DINO 180XT 96 ELECTRIC SCHEMA DIESEL AGGREGATE...
Page 97: ...DINO 180XT 97 ELECTRIC SCHEMA DIESEL AGGREGATE...
Page 99: ...DINO 180XT 99 HYDRAULIC SCHEME 230VAC 18001...
Page 101: ...DINO 180XT 101 HYDRAULIC SCHEME 110VAC 18001...
Page 102: ...DINO 180XT 102 Notes...