EN-14 452162.66.09 · FD 9512
www.dimplex.de
English
LAW 6IMR - LAW 14ITR
8 Test points,
maintenance and
troubleshooting
If no faults have occurred here by this point, the unit can now be
operated and you can enjoy the benefits of the LAK split heat
pump.
Before commissioning the unit, run through the test points out-
lined in this chapter.
You will also find instructions for maintenance and troubleshoot-
ing here.
8.1 Checklist prior to commissioning
ATTENTION!
Before opening the unit, ensure that all electric circuits are isolated from
the power supply.
Pos.
Category
Components
Test point
1
Current
Field wiring
All switches with contacts with different polarities should be connected se-
curely in accordance with the specified directives or laws.
Cable connections should only by made by trained specialist personnel.
Cable connections and electrical components available separately should
comply with European and local directives.
Cable connections should be made in accordance with the circuit diagram pro-
vided with this unit.
2
Circuit breakers
A circuit breaker (earth leakage breaker) with 30 mA should be installed.
The circuit breaker in the control cabinet of the indoor unit should be switched
on before the unit is commissioned.
3
Earthing
An earthing wire should be connected. Never connect an earthing wire to a gas
pipe, water piping, a metal object of the building, a surge protection socket or
similar.
4
Power supply unit
Use a separate mains cable.
5
Cable connections of the
terminal panel
Connections on the terminal panel (in the control cabinet of the indoor unit)
should be fixed in place securely enough.
6
Water pressure
Filling pressure
After filling with water, the pressure gauge should show a pressure of 1.0 to 1.5
bar. The maximum pressure should not exceed 3.0 bar.
7
Purging
While filling with water, the system should be purged via the purging hole.
If no water comes out after pressing on the tip (on the top side of the opening),
the purging process is not yet complete.
If the system has been purged optimally, water sprays out like a fountain when
pressing on the tip. Take care when testing the purging. Water could spray on
your clothes.
8
Isolating valve
The isolating valves (on-site) should be open.
11
Installing the unit
Maintenance of compo-
nents
There should be no visibly damaged components in the indoor unit.
12
Refrigerant leak
Refrigerant leaks reduce the output of the unit. In the event of leaks, please in-
form an authorised after-sales service partner.
Summary of Contents for LAK 14IMR
Page 2: ......
Page 22: ...DE 20 452162 66 09 FD 9512 www dimplex de Deutsch LAK 6IMR LAK 14ITR ...
Page 42: ...EN 20 452162 66 09 FD 9512 www dimplex de English LAW 6IMR LAW 14ITR ...
Page 62: ...FR 20 452162 66 09 FD 9512 www dimplex de Français LAK 6IMR LAK 14ITR ...
Page 78: ...A XVI 452162 66 09 FD 9512 www dimplex de Anhang Appendix Annexes LAK 6IMR LAK 14ITR ...
Page 79: ...www dimplex de 452162 66 09 FD 9512 A XVII Anhang Appendix Annexes LAK 6IMR LAK 14ITR ...