Installation and Set-Up
1.1 Installation
1.1 Installation
Connect the cables to the system box.
5
7
6
K
3
4
AC
2
3
1
!
Comm 1,
"
Comm 2,
#
Comm 3 (Serial printer),
$
Keyboard,
%
Kensington lock socket,
&
Parallel printer,
'
Monitor
Connect the cables to the monitor.
Check your monitor manual for correct installation.
Push the system box and monitor power switches on.
A green light in the switch indicates that power is on.
Power Up Selftest
The terminal takes a few seconds to warm up and complete its power
up self-tests. Then, the terminal should display ‘‘Selftest OK.’’ If a
problem occurs, go to the Appendix A.
1–2 Installation and Set-Up
Summary of Contents for VGB25
Page 1: ...VGB25 Color Video Terminal Installation and Operating Information Order Number EK VGB25 IN B01...
Page 22: ......
Page 44: ......