OPERATOR’S MANUAL
PM300E and PM332E Planter Monitors
11001-1423-200710
10 / INSTALLATION
INSTALLING CONSOLE HARNESSES
Console harnesses are located at the bottom of the monitor. These include
power, ground speed sensor, and sensor inputs (rows, lift switch, two
hopper levels, and one frequency function [shaft/fan/flow]).
Figure 4
Console Harnesses
1. Route the power harness to a +12 V source near the battery if
possible.
2. Route the ground speed sensor harness connection to the RADAR,
Hall Effect, or GPS ground speed sensor.
3. Route the implement harness to the location of choice, typically near
the drawbar
.
The harnesses must not obstruct movement of the operator or of
the moving parts of the tractor or implement. Take care when
routing harnesses to secure them at proper locations; provide
slack as needed to allow for movement.
Poor +12 V connections may cause intermittent console operation.
Be sure to connect the power harness to a clean, well-conditioned
source (direct battery connection is preferred).
+
Ground
Speed
Battery
PMXXX
ENTER
ESCAPE
ACCY
SETUP
DISPLAY
&
SERVICE
GROUND
SPEED
SETUP
LIMITS
SETUP
OPERATE
PLANTER
SETUP
SPEED
AREA
MODE
SEED
COUNT
MODE
Implement
(rows and accessories)
*
*PM300E does not have a second cable
PM332E has a 9-pin accessory cable
Summary of Contents for PM300E
Page 4: ...OPERATOR S MANUAL PM300E and PM332E Planter Monitors 11001 1423 200710 2 SAFETY NOTICES...
Page 8: ...OPERATOR S MANUAL PM300E and PM332E Planter Monitors 11001 1423 200710 6 INTRODUCTION...
Page 10: ...OPERATOR S MANUAL PM300E and PM332E Planter Monitors 11001 1423 200710 8 MAJOR FEATURES...
Page 14: ...OPERATOR S MANUAL PM300E and PM332E Planter Monitors 11001 1423 200710 12 INSTALLATION...
Page 30: ...OPERATOR S MANUAL PM300E and PM332E Planter Monitors 11001 1423 200710 28 AUXILIARY MODES...
Page 46: ...OPERATOR S MANUAL PM300E and PM332E Planter Monitors 11001 1423 200710 44 TROUBLESHOOTING...
Page 48: ...OPERATOR S MANUAL PM300E and PM332E Planter Monitors 11001 1423 200710 46 CONNECTOR PINOUTS...