Page 1: ...ion Cable ciz Step 1 D D D D Obtain the following from your supervisor a 3276 Device Cable Attachment chart required for Step 11 b 3276 Switch Settings chart required for Step 12 c Communication Cable...
Page 2: ...lem Determination Guide D Insert the Problem Determination Guide in the keyboard with the hinged edge toward the front tap it int place and close the cover Step 3 D Turn the keyboard over D Release th...
Page 3: ...the front of the 3276 D Remove the plastic safety catch if present from the power cord by breaking the catch Position the power cord under the display station and extend it toward the power outlet but...
Page 4: ...g nuts Retainer Wire in Open Position Stud Fuse o Power Cord Step 7 Keyboard Cable D Remove the protective bag from the keyboard cable connector D Place the keyboard cable clamp over the right hand st...
Page 5: ...10 C l I On Off 0 Switch CJ D Place the power cord communication cable keyboard cable etc so they do not interfere with closing the front cover D Install the front cover on the pivot pins Close the c...
Page 6: ...tation has an address keylock turn the address keylock key counterclock wise to lock the drawer Step 13 Address Keylock IL A a A Switch Normal Test Switch g security Keylock Volume Control Contrast Co...
Page 7: ...result 1 or 2 does not occur retry by turning the display station off then on again If result 1 or 2 still does not occur or C nn is displayed record this step on a 3276 3278 3279 Problem Report Form...
Page 8: ...fllsAc or2 34sb 7 c 1 c c 1 r lt01234Sb7scia 11 E _ D Scan the Operator Information Area bottom of screen below the solid horizontal line The characters should be the same as those shown below for the...
Page 9: ...eat the character Also during the following procedure the key marked CONTROL in the diagram must not be pressed Press one at a time the four keys shown in the diagram with the double characters mm nn...
Page 10: ...e Operator Information Area D 4 Press the CONTROL key then the M A B and C keys once each then M then A then B then C ABC appears at the start of the first line of the display 5 Set the Normal Test sw...
Page 11: ...applicable checks in Section 4 of the 3276 Problem Determination Guide which is under the keyboard cover Notify your supervisor that the 3276 setup is completed and that the 3276 communication cable m...
Page 12: ...to the r 1 to connect 1d lock ttM de K ublel to the port sockets 2 Connect IN dnice clble MNntified for port 1 to the pon 1 socket port 2 to the port 2 socket end on Connect the clbla 1n numeric order...