Fill level sufficient
1.
Switch on the device using the mains power switch. A signal tone sounds. The software
version is shown on the display. The actual temperature is shown on the display
afterwards.The temperature control device starts operation; the pumps are started.
Depending on the specified set point temperature, the refrigerant unit is started after 2
minutes at the earliest. The blue LED lights if the refrigerant unit is activ
Fill level too low (Low Level)
2.
Switch on the device using the mains power switch. A signal tone sounds. The software
version is shown on the display. FILL is shown on the display afterwards. In the case of
Low Level, the pumps and the refrigerant unit are not started. Fill the device with heat
transfer liquid.
3.
Carefully pull up the cover of the filler neck; do not turn.
4.
Fill the heat transfer liquid into the filler neck carefully. Monitor the level indicator. Fill the
device up to the maximum fill level. The pumps start when the minimum level is reached.
If necessary, use a funnel for the filling.
The level indicator must not be above the max- imum fill level.
Fill level drops
5.
Top up the heat transfer liquid carefully as the consumer is now being filled. If the fill
level drops too far, the device automatically goes into the FILL mode and the pump and
refrigerant unit are switched off. Continue with the filling until operation without problems
is possible. Monitor the level indicator for this.
6.
Press the cover carefully into the filler neck.
Summary of Contents for Bioruptor Pico
Page 1: ...Bioruptor Pico Sonication System Version 3 01_2020 USER GUIDE ...
Page 4: ......
Page 5: ...BIORUPTOR PICO ...
Page 20: ......
Page 21: ...BIORUPTOR COOLER ...
Page 22: ......
Page 46: ......
Page 47: ......
Page 48: ...www diagenode com ...