S Series Shelter
Operation & Maintenance
95310-02
2-14
DHS Systems, LLC
This document contains information proprietary to DHS Systems LLC and is intended solely for use by its customers. No portion of this document may
be reproduced for release to a third party without written consent from DHS Systems LLC
.
018.01 Plastic Door Strip
A Plastic Strip Door helps maintain interior climate control during continual ingress/egress. To install the plastic Strip
Door:
1.
Remove the plastic Strip Door from the bag.
2.
Locate the peak of the Strip Door. The peak has a grommet and cord located on the Connector Strip.
3.
Match the peak of the connector with the peak of the doorway. Locate the peak of the doorway by locating the
grommet on the Velcro connector strip.
4.
Tie the Strip Door to the shelter using the cord.
5.
Secure the Velcro connector strip by working your way down the Strip Door, 1.5 feet at a time.
019.01 Plenum
A Plenum provides even distribution of heated or cooled air throughout the Shelter. To install the Plenum:
1.
Remove the Plenum from the bag.
2.
Insure that at least two feet (2’) of the supply ducting is pulled inside the Shelter through the duct port located above the
window near the doorway.
3.
Slip the Plenum over the duct until the first hook on the Plenum reaches the looped keeper closest to the duct port.
4.
Secure the Plenum to the duct with the provided cord.
5.
Attach the hooks affixed along the length of the Plenum to the corresponding looped keepers.
6.
The air flow through the Plenum may be regulated by adjusting the opening(s) with the drawstring.
020.01 Privacy
Curtain
A Privacy Curtain provides for semi-private areas within the Shelter. When the curtain is installed, a three-foot (3’) corridor
remains in the Shelter. To install the Privacy Curtain:
1.
Remove the Privacy Curtain from the bag and locate the green plastic hook.
2.
Attach the green hook to the looped keepers at the four-foot level.
3.
Attach the white hooks to the looped keepers located at the top and in between the windows.
021.01 Sub-floor
The Shelter Sub-floor provides substantial protection from rough and rocky terrain as well as insulation from ice and snow.
The Sub-floor lies between the ground cover and the floor and must be installed prior to laying down the floor. To install
the Sub-floor:
1.
Remove the two pieces of Sub-floor from the bag and unroll.
2.
Lay the Sub-floor so that it follows the footprint of the ground cover. Be sure not to cover any Velcro.
3.
Install interior floor over the Sub-floor.
022.01 Window
Set
The plastic Window Set covers the Shelters’ interior mesh windows and allow ambient light to enter the Shelter while
maintaining a controlled environment inside. To install the Window Set:
1.
Remove the Window from the Window Set bag.
2.
Keep Window flaps open using the Velcro ties.
3.
The back of each window has four (4) Velcro strips
along the perimeter and the other side has three (3)
Velcro strips.
4.
Position the Window so that the edge without any Velcro
is on top and facing inward.
5.
Starting from the narrow end and leaving approximately
1 inch overlap, secure the Velcro from top to bottom.
6.
Continue joining the Velcro until the Window is secure.
NOTE
WINDOW SETS CAN BE CLEANED
WITH A MIXTURE OF HOT SOAPY
WATER, OR ANY HOUSEHOLD
WINDOW CLEANER.
DO NOT USE
AMMONIA OR CLEANERS THAT
CONTAIN AMMONIA, AS THEY WILL
PERMANENTLY CLOUD THE WINDOW
MATERIAL.