S Series Shelter
Operation & Maintenance
95310-02
2-10
DHS Systems, LLC
This document contains information proprietary to DHS Systems LLC and is intended solely for use by its customers. No portion of this document may
be reproduced for release to a third party without written consent from DHS Systems LLC
.
12.
Repeat Steps 8 through 11 on the other side of the shelter.
13.
To complete installation of the system plenum, plug in the booster fan.
014.01 System Wiring Installation
A System Wiring Package includes the following standard components:
1 - 50’ trailer lead
3 - light leads
2 - 30’ trailer leads
3 - GFCI
The number of internal leads and Isobars included with the wiring package varies depending on the System.
To install a DRASH System Wiring Package:
1.
Locate the wiring package.
2.
Unpack both the 50 foot (1) and 30 foot (2) trailer leads.
3.
Unlock and save the clear cable tie.
4.
Plug each lead into any three plug receptacle on the trailer. These are located beneath the Control Panel.
5.
Extend the 50 foot lead to reach the electrical port of the shelter at the base of the”U” configuration.
(
Refer to
Figure
2-14
)
6.
The two 30’ foot leads should be positioned to reach the electrical ports on the long sides of the “U” configuration.
7.
Pull trailer leads into shelter through both external and internal electrical ports.
8.
In each shelter, plug the GFCI into trailer lead. Continue the connection by plugging the Isobar 4 into the GFCI.
9.
Once this connection is made, plug light lead into Isobar 4.
10.
Additional outlets can be added by utilizing internal leads and Isobar 2’s included in the wiring package.
11.
Optional light sets should be plugged in at this time.