MPC1-1000 and MPC1-3000 User’s Manual
2.
I
NSTALLATION
2.1
UNPACKING AND INSPECTION
The MPC1 is delivered with the inlet valve closed, exhaust valve open and the variable volume (VV)
fully screwed in. Cap plugs are pushed into all rear panel pressure connections.
2.2
SITE REQUIREMENTS
•
Gas supply up to maximum amount for model used
•
Vacuum source is necessary
2.3
INITIAL SETUP
The MPC1 should be connected to a suitable source of clean, dry, non-corrosive gas using a
1/8 in. NPT male connector to supply (1) on the rear panel. Using the same type connector, hook up
the test system to (2), vacuum source to (4), and any external venting tubing to (3) required to the
corresponding connections on the rear panel. See Figure 2.
The front feet can be folded out to tilt the unit up if desired.
Page
3
© 2001 - 2007
DH Instruments, a Fluke Company