TABLE OF CONTENTS 

 

1.0 

SAFETY REGULATIONS .................................... 3 

1.1 

SAFETY LABELING AND WARNING SIGNS3 

1.2 

IMPORTANT NOTICE................................... 3 

2.0 

INSTALLATION ................................................... 3 

2.1 

GENERAL ..................................................... 3 

2.2 

POSITIONING .............................................. 4 

2.2.1 

Installation considerations ..................... 4 

2.3 

INSTALLATION OF THE COMPONENTS .... 5 

2.3.1 

Installing the terminal in the wall ............ 5 

2.3.2 

Insulated flexible venting ....................... 6 

2.3.3 

Connection to the furnace breech ......... 7 

2.3.4 

Connection to the vent terminal ............. 7 

2.4 

CONNECTION OF THE AIR INTAKE PIPE .. 8 

2.4.1 

Additional parts required (not included in 

VTK kit) .................................................. 8 

2.4.2 

Intake pipe length .................................. 8 

2.4.3 

Beckett AFII Burner ............................... 8 

2.4.4 

Beckett NX Burner ................................. 8 

2.4.5 

Riello 40-BF burner................................ 8 

2.4.6 

Terminal connection .............................. 8 

2.4.7 

Intermediate piping ................................ 9 

2.5 

INSTALLATION OF THE BVSO JUMPER .... 9 

3.0 

OPERATION ........................................................ 9 

3.1 

COMBUSTION GAS TEMPERATURE  

VERIFICATION ............................................. 9 

3.2 

BURNER POST PURGE DELAY 

ADJUSTMENT .............................................. 9 

4.0 

MAINTENANCE ................................................... 9 

 

FIGURES 

 

Figure 1: Minimum clearance ............................................... 4

 

Figure 2: Components identification ..................................... 5

 

Figure 3: Installation of the terminal in the wall .................... 6

 

Figure 4: Installation of the stabiliser shroud ........................ 6

 

Figure 5: Pressure switch location ....................................... 6

 

Figure 6: Caulking around the stabiliser shroud ................... 6

 

Figure 7: Installation of the transition / terminal coupling ..... 7

 

Figure 8: Seams alignment .................................................. 7

 

Figure 9: Connection to the breech plate ............................. 7

 

Figure 10: Connection to the vent terminal .......................... 8

 

Figure 11: BVSO jumper ...................................................... 9

 

Figure 12: Dimensions ....................................................... 11

 

Figure 13: Wiring Diagram ................................................. 11

 

Figure 14: Parts List ........................................................... 12

 

 

 
 

TABLES 

 

Table 1: Minimum clearance around a vent system ............. 4

 

Table 2: Maximum and minimum vent pipe length ............... 4

 

Table 3: Approved furnaces for used with VTK / IFV ......... 10

 

Table 4: Parts List .............................................................. 12

 

Summary of Contents for KLAVT0101DET

Page 1: ...inted in Canada Printed on 100 recycled paper INSTALLER SERVICE TECHNICIAN USE THE INFORMATION IN THIS MANUAL FOR THE INSTALLATION AND SERVICING OF THE FURNACE AND KEEP THE DOCUMENT NEAR THE UNIT FOR...

Page 2: ...TALLATION OF THE BVSO JUMPER 9 3 0 OPERATION 9 3 1 COMBUSTION GAS TEMPERATURE VERIFICATION 9 3 2 BURNER POST PURGE DELAY ADJUSTMENT 9 4 0 MAINTENANCE 9 FIGURES Figure 1 Minimum clearance 4 Figure 2 Co...

Page 3: ...t with water c Do not store gasoline or any other flammable substances such as paper carton etc near the furnace IMPORTANT All local and national code requirements governing the installation of oil bu...

Page 4: ...e 2 2 1 Installation considerations The vent may be installed through a wall with a minimum thickness of 2 5 08 cm and a maximum thickness of 15 38 10 cm Select a location for the vent terminal in acc...

Page 5: ...Installing the terminal in the wall 1 Open up a 6 15 24 cm hole for the VTK 53A VTK1 VTK 54A VTK098 KLAVT0101DET and VTK 64A VTK2 terminals and a 6 15 88 cm hole for the VTK 65A VTK3 KLAVT0201DET ter...

Page 6: ...secure the back of the shroud to the wall Do not over tighten the screws or it will distort the stabiliser shroud The screws will not be necessary on a concrete or block wall as the mortar can provid...

Page 7: ...ce on the furnace breech plate 5 The installation of the transition must be such that the port for pressure measurements is at the top and accessible once the installation is completed Do not install...

Page 8: ...ransition bushings to go from PVC or ABS to ASTM D 2729 Septic Sewer Pipe if applicable If PVC fittings are mixed with ABS fittings use solvent cement that is approved for bonding the two plastics 2 4...

Page 9: ...93 C 200 F In case it is impossible to obtain this temperature after 5 minutes of operation it is recommended to relocate the furnace in order to shorten the length of the vent pipe After the modific...

Page 10: ...BF3 VTK 53A IFV 310A IFV 315A IFV 320A OHB64F AFII 150 R40 BF5 VTK 64A IFV 410A IFV 415A IFV 420A OLB53F AFII 85 R40 BF3 VTK 53A IFV 310A IFV 315A IFV 320A OLB53R AFII 85 R40 BF3 VTK 53A IFV 310A IFV...

Page 11: ...11 Figure 12 Dimensions Figure 13 Wiring Diagram...

Page 12: ...minal B03906 01 B03906 02 B03906 02 B03906 03 7 Pressure Gauge R99F033 R99F032 R99F032 R99F034 8 Connector with Port B03907 01 B03907 02 B03907 03 B03907 04 9A Insulated Flex Vent 10 long IFV 310A IFV...