background image

 

12

Figure 14 : Parts List 

 
 

Table 4 : Parts List 

 

 

10 

10 

11 

12 

13 

VTK-53A                 

VTK1

VTK-54A                     

VTK098               

KLAVT0101DET

VTK-64A                   

VTK2

VTK-65A                           

VTK3           

KLAVT0201DET

1

End Cone

4DETECK1

4DETECK1

4DETECK1

4DETECK1

2

Stabiliser Shroud

4DETTEK1

4DETTEK2

4DETTEK2

4DETTEK3

3

Screw Philips 8-32 x 1/2" SS

N / D

N / D

N / D

N / D

4

Screw Philips #10 x 2" SS

N / D

N / D

N / D

N / D

5

Interior Mounting Plate

N / D

N / D

N / D

N / D

6

Vent Terminal

B03906-01

B03906-02

B03906-02

B03906-03

7

Pressure Gauge

R99F033

R99F032

R99F032

R99F034

8

Connector with Port

B03907-01

B03907-02

B03907-03

B03907-04

9A

Insulated Flex Vent 10' long

IFV-310A

IFV-410A

IFV-410A

IFV-510A

9A

Insulated Flex Vent 15' long

IFV-315A

IFV-415A

IFV-415A

IFV-515A

9A

Insulated Flex Vent 20' long

IFV-320A

IFV-420A

IFV-420A

IFV-520A

10

Teks Screw #8 x 1/2" SS

F03G009

F03G009

F03G009

F03G009

11

Connector without Port

B03908-01

B03908-02

B03908-02

B03908-03

12

BVSO Jumper

B03337

B03337

B03337

B03337

13

Hi Temp Silicone

F10G005

F10G005

F10G005

F10G005

ITEM

DESCRIPTION

Part No

Summary of Contents for KLAVT0101DET

Page 1: ...inted in Canada Printed on 100 recycled paper INSTALLER SERVICE TECHNICIAN USE THE INFORMATION IN THIS MANUAL FOR THE INSTALLATION AND SERVICING OF THE FURNACE AND KEEP THE DOCUMENT NEAR THE UNIT FOR...

Page 2: ...TALLATION OF THE BVSO JUMPER 9 3 0 OPERATION 9 3 1 COMBUSTION GAS TEMPERATURE VERIFICATION 9 3 2 BURNER POST PURGE DELAY ADJUSTMENT 9 4 0 MAINTENANCE 9 FIGURES Figure 1 Minimum clearance 4 Figure 2 Co...

Page 3: ...t with water c Do not store gasoline or any other flammable substances such as paper carton etc near the furnace IMPORTANT All local and national code requirements governing the installation of oil bu...

Page 4: ...e 2 2 1 Installation considerations The vent may be installed through a wall with a minimum thickness of 2 5 08 cm and a maximum thickness of 15 38 10 cm Select a location for the vent terminal in acc...

Page 5: ...Installing the terminal in the wall 1 Open up a 6 15 24 cm hole for the VTK 53A VTK1 VTK 54A VTK098 KLAVT0101DET and VTK 64A VTK2 terminals and a 6 15 88 cm hole for the VTK 65A VTK3 KLAVT0201DET ter...

Page 6: ...secure the back of the shroud to the wall Do not over tighten the screws or it will distort the stabiliser shroud The screws will not be necessary on a concrete or block wall as the mortar can provid...

Page 7: ...ce on the furnace breech plate 5 The installation of the transition must be such that the port for pressure measurements is at the top and accessible once the installation is completed Do not install...

Page 8: ...ransition bushings to go from PVC or ABS to ASTM D 2729 Septic Sewer Pipe if applicable If PVC fittings are mixed with ABS fittings use solvent cement that is approved for bonding the two plastics 2 4...

Page 9: ...93 C 200 F In case it is impossible to obtain this temperature after 5 minutes of operation it is recommended to relocate the furnace in order to shorten the length of the vent pipe After the modific...

Page 10: ...BF3 VTK 53A IFV 310A IFV 315A IFV 320A OHB64F AFII 150 R40 BF5 VTK 64A IFV 410A IFV 415A IFV 420A OLB53F AFII 85 R40 BF3 VTK 53A IFV 310A IFV 315A IFV 320A OLB53R AFII 85 R40 BF3 VTK 53A IFV 310A IFV...

Page 11: ...11 Figure 12 Dimensions Figure 13 Wiring Diagram...

Page 12: ...minal B03906 01 B03906 02 B03906 02 B03906 03 7 Pressure Gauge R99F033 R99F032 R99F032 R99F034 8 Connector with Port B03907 01 B03907 02 B03907 03 B03907 04 9A Insulated Flex Vent 10 long IFV 310A IFV...

Reviews: