Dettson KLAVT0101DET Installation Instructions And Homeowner'S Manual Download Page 7

 

7

surrounded  by  insulation  and  covered  with  an  outer  tube of 
4”  (10,16  cm),  5”  (12,70  cm),  or  6”  (15,24  cm)    flexible 
corrugated  aluminium  sleeve  to  protect  the  insulation. 
Splicing 

vent 

lengths 

together 

is 

prohibited. 

Minimum/maximum  continuous  vent  lengths  permitted  for 
installation  are  3'  (0,91  m)  minimum  and  20'  (6,10  m) 
maximum respectively. 
 
2.3.3 

Connection to the furnace breech 

 

1.  Determine the length of the flexible vent (item I) and cut 

it as required; 

2.  Install the flexible vent in its ultimate position; 

3.  Proceed with the installation of the transition (item H) on 

the  flexible  vent  (item  I).  Apply  some  high-temperature 
sealant (item M) on the threads of the transition piece to 
ensure air tightness then screw the transition piece right 
up to the end of the vent as shown in Figure 7.   Make 
sure  that  the  seam  on  the  corrugated  stainless  steel 
flexible vent (item I) is well aligned with the seam of the 
transition  (item  H),  otherwise  you  will  not  be  able  to 
screw  it  properly  (see  Figure  8).    The  corrugated 
aluminium jacket fits inside of the transition outside ring 
(item H); 

 

WARNING 

 

Make  sure  that  the  flexible  vent  (item  I)  is  well  secured 
by  the  threads of the transition (item H) by pulling it.  If 
you  can  remove  the  transition  (item  H)  without 
unscrewing  it,  your  installation  will  not  be  air  tight.  
Then, you must replace the defective part. 

 

 

Figure 7 : Installation of the transition / terminal coupling

 

 

4.  Apply a high temperature silicone bead (item M) around 

the  outside  ring  of  the  breech  plate.    Install  the 
transition (item H) piece on the furnace breech plate; 

5.  The  installation  of  the  transition  must  be  such  that  the 

port  for  pressure  measurements  is  at  the  top  and 
accessible  once  the  installation  is  completed.    Do  not 
install  the  transition  with  the  test  port  pointing 
downward.  For details, see Figure 9; 

6.  Complete the assembly by using 3 #8 x 1/2" self-drilling 

screws  (item  J)  as  shown  in  Figure  9.    The  seal  is 
permanent  and  should  never  need  to  be  disconnected 
as the breech plate can be removed by unscrewing the 
nuts; 

7.  Apply  sealant  (item  M)  to  cover  completely  the  self-

drilling screw heads (item J); 

Figure 8 : Seams alignment 

 
8.  In  order  not  to  damage  the  sealant,  only  the  breech 

plate  on  the  furnace  should  be  removed  if  and  as 
required. 

 

Figure 9 : Connection to the breech plate 

 

2.3.4 

Connection to the vent terminal 

 

1.  Install the terminal coupling (item K) on the flexible vent 

(item  I).  Apply  some high-temperature sealant (item M
on  the  threads  of  the  terminal  coupling  to  ensure  air 
tightness then screw the transition piece right up to the 
end  of  the  vent  as  shown  in  Figure  7.    Make  sure  that 
the seam on the corrugated stainless steel flexible vent 
(item  I)  is  well  aligned  with  the  seam  of  the  terminal 
coupling  (item  K),  otherwise  you  will  not  be  able  to 
screw  it  properly  (see  Figure  8).    The  corrugated 
aluminium  jacket  fits  inside  of  the  terminal  coupling 
outside ring (item K); 

 

WARNING 

 

Make  sure  that  the  flexible  vent  (item  I)  is  well  secured 
by  the  threads of the transition (item H) by pulling it.  If 
you  can  remove  the  transition  (item  H)  without 
unscrewing  it,  your  installation  will  not  be  air  tight.  
Then, you must replace the defective part. 

 

DNS-1312 Rev A  

SEAM OF THE TRANSITION / TERMINAL COUPLING 

        SEAM OF THE FLEXIBLE VENT 

DNS-1342 Rev B  

Summary of Contents for KLAVT0101DET

Page 1: ...inted in Canada Printed on 100 recycled paper INSTALLER SERVICE TECHNICIAN USE THE INFORMATION IN THIS MANUAL FOR THE INSTALLATION AND SERVICING OF THE FURNACE AND KEEP THE DOCUMENT NEAR THE UNIT FOR...

Page 2: ...TALLATION OF THE BVSO JUMPER 9 3 0 OPERATION 9 3 1 COMBUSTION GAS TEMPERATURE VERIFICATION 9 3 2 BURNER POST PURGE DELAY ADJUSTMENT 9 4 0 MAINTENANCE 9 FIGURES Figure 1 Minimum clearance 4 Figure 2 Co...

Page 3: ...t with water c Do not store gasoline or any other flammable substances such as paper carton etc near the furnace IMPORTANT All local and national code requirements governing the installation of oil bu...

Page 4: ...e 2 2 1 Installation considerations The vent may be installed through a wall with a minimum thickness of 2 5 08 cm and a maximum thickness of 15 38 10 cm Select a location for the vent terminal in acc...

Page 5: ...Installing the terminal in the wall 1 Open up a 6 15 24 cm hole for the VTK 53A VTK1 VTK 54A VTK098 KLAVT0101DET and VTK 64A VTK2 terminals and a 6 15 88 cm hole for the VTK 65A VTK3 KLAVT0201DET ter...

Page 6: ...secure the back of the shroud to the wall Do not over tighten the screws or it will distort the stabiliser shroud The screws will not be necessary on a concrete or block wall as the mortar can provid...

Page 7: ...ce on the furnace breech plate 5 The installation of the transition must be such that the port for pressure measurements is at the top and accessible once the installation is completed Do not install...

Page 8: ...ransition bushings to go from PVC or ABS to ASTM D 2729 Septic Sewer Pipe if applicable If PVC fittings are mixed with ABS fittings use solvent cement that is approved for bonding the two plastics 2 4...

Page 9: ...93 C 200 F In case it is impossible to obtain this temperature after 5 minutes of operation it is recommended to relocate the furnace in order to shorten the length of the vent pipe After the modific...

Page 10: ...BF3 VTK 53A IFV 310A IFV 315A IFV 320A OHB64F AFII 150 R40 BF5 VTK 64A IFV 410A IFV 415A IFV 420A OLB53F AFII 85 R40 BF3 VTK 53A IFV 310A IFV 315A IFV 320A OLB53R AFII 85 R40 BF3 VTK 53A IFV 310A IFV...

Page 11: ...11 Figure 12 Dimensions Figure 13 Wiring Diagram...

Page 12: ...minal B03906 01 B03906 02 B03906 02 B03906 03 7 Pressure Gauge R99F033 R99F032 R99F032 R99F034 8 Connector with Port B03907 01 B03907 02 B03907 03 B03907 04 9A Insulated Flex Vent 10 long IFV 310A IFV...

Reviews: