background image

REQUIRED NOTICE FOR MASSACHUSETTS INSTALLATIONS -

IMPORTANT

The Commonwealth of Massachusetts requires compliance with regulation 248 CMR as follows:
5.08: Modifications to NFPA-54, Chapter 10. Revise 10.8.3 by adding the following additional requirements:
For all side wall horizontally vented gas fuelld equipement installed in every dwelling, building or structure used in whole or in part for
residential purposes, including those owned or operated by the commonwealth and where the side wall exhaust vent termination is
less than seven (7) feet above finished grade in the area of the venting, including but not limited to decks and porches, the following
requirements shall be satisfied:

Installation of Carbon Monoxide Detectors

At the time of installation of the side wall horizontal vented gas fuelled equipment, the installing plumber or gas fitter shall observe
that a hard wired carbon monoxide detector with an alarm and battery backup is installed on the floor level where the gas equipment
is to be installed. In addition, the installing plumber or gas fitter shall observe that a battery operated or hard wired carbon monoxide
detector with an alarm is installed on each additional level of the dwelling, building or structure served by the side wall horizontal vented
gas fuelled equipment. It shall be the responsibility of the property owner to secure the services of qualified license professionals for
the installation of hard wired carbon monoxide detectors.
In the event that the side wall horizontally vented gas fuelled equipment is installed in a crawl space or an attic, the hard wired carbon
monoxide detector with alarm and battery backup may be installed on the next adjacent floor level.
In the event that the requirements of this subdivision cannot be met at the time of completion of installation, the owner shall have a
period of thirty (30) days to comply with the above requirement; provided, however, that during said thirty (30) day period, a battery
operated carbon monoxide detector with an alarm shall be installed.

APPROVED CARBON MONOXIDE DETECTORS:

Each carbon monoxide detector as required in accordance with the above provision

shall comply with NFPA 720 and be ANSI/UL 2034 listed and IAS certified.

SIGNAGE:

A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height

of eight (8) feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fuelled heating appliance
or equipment. The sign shall read, in print size no less than in-half (1/2) inch in size, “gas vent directly below. Keep clear of all
obstruction”.

INSPECTION:

the state of local gas inspector of the side wall horizontally vented gas fuelled equipment shall not approve the

installation unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with
the provisions of 248 CMR 5.08 (2) (a) 1 through 4:

EXEMPTION:

the following equipment is exempt from 248 CMR 5.08(2) (a) 1 through 4:

The equipment listed in Chapter 10 entitled “equipment not required to be vented “in the most current edition of NFPA 54 as adopted
by the board; and
Product approved side wall horizontally vented gas fuelled equipment installed in a room or structure separate from the dwelling,
building or structure in whole or in part for residential purposes.

MANUFACTURER REQUIREMENTS – GAS EQUIPMENT VENTING SYSTEM PROVIDED

When the manufacturer of product approved side wall horizontally vented gas equipment provides a venting system design or venting
system component with the equipment, the instructions provided by the manufacturer for installation of the equipment and the venting
system shall include:
Detailed instructions for the installation of the venting system design or the venting system components; and a complete parts list for
the venting system design or venting system.

MANUFACTURER REQUIREMENTS – GAS EQUIPMENT VENTING SYSTEM PROVIDED

When the manufacturer of product approved side wall horizontally vented gas fuelled equipment does not provide the parts or venting
the flue gases, but identifies “special venting system”, the following requirements shall be satisfied by the manufacturer:
The referenced “special venting system” shall be product approved by the board, and the instruction for that system shall include a
parts list and detailed installation instructions.
A copy of all installation instructions for all product, approved side wall horizontally vented gas fuelled equipment, all venting
instructions, all part s lists for venting instructions, and/or all venting design instructions shall remain with the appliance or equipment
at the completion of the installation.
For questions regarding these requirements, please contact the Commonwealth of Massachusetts board of State Examiners of
Plumbers and Gas Fitters, 239 Causeway Street, Boston, MA, 02114, tel.: 617 727-9952.

FOR CALIFORNIA RESIDENT

For installation in SCAQMD only: This furnace does not meet the SCAQMD Rule 1111 14ng/J NOx emission limit, and thus is subject
to a mitigation fee of up to $450. This furnace is not eligible for the Clean Air Rebate Program: www.CleanAirFurnaceRebate.com
The efficiency is AHRI efficiency rating certified. This furnace meets California Air Quality Management District emission requirements.

3

Summary of Contents for C105-2-V

Page 1: ...n in this manual for the installation servicing of the furnace and keep the document near the unit for future reference HOMEOWNER Please keep this manual near the furnace for future reference Manufactured by Dettson Industries Inc Sherbrooke Qc Canada www dettson com Gas furnace manufactured on or after May 1 2017 are not permitted to be used in Canada for heating of buildings or structures under ...

Page 2: ...scal treatment 14 5 GAS SUPPLY AND PIPING 15 5 1 GENERAL 15 5 2 PROPANE CONVERSION 15 5 3 GAS PIPE GROMMET 15 5 4 SETTING GAS OUTLET PRESSURE 15 6 ELECTRICAL CONNECTIONS 17 6 1 120V WIRING 17 6 2 24V THERMOSTAT WIRING 17 6 3 FUSE 17 6 4 THERMOSTATS 17 6 4 1 Single Stage thermostat 17 6 4 2 Multi Stage thermostat 17 6 5 ELECTRIC DIAGRAM 17 6 6 ALTERNATE POWER SUPPLY 17 7 VENTING AND COMBUSTION AIR ...

Page 3: ...2 Figure 28 Venting gasket 22 Figure 29 Direct vent clearance 23 Figure 30 Other than Direct vent clearance 24 Figure 31 Dimensions 31 Figure 32 Two Stage ECM Wiring diagram 32 Figure 33 Exploded view Cxx 2 V part 1 35 Figure 34 Exploded view Cxx 2 V part 2 36 List of tables Table 1 Codes and Standards 7 Table 2 Minimum clearance 8 Table 3 Suggested Return size 14 Table 4 Inlet Gas Pressure 16 Tab...

Page 4: ...n in half 1 2 inch in size gas vent directly below Keep clear of all obstruction INSPECTION the state of local gas inspector of the side wall horizontally vented gas fuelled equipment shall not approve the installation unless upon inspection the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR 5 08 2 a 1 through 4 EXEMPTION the followi...

Page 5: ...nace to show and explain to you the following items The main disconnect switch or circuit breaker The gas shut off valve The air filter and how to change it at least twice a year 7 Before calling for service be sure to have the information of section 11 of your manual close by in order to be able to provide the contractor with the required information such as the model and serial numbers of the fu...

Page 6: ...ion of air 8 Gas furnace manufactured on or after May 1 2017 are not permitted to be used in Canada for heating of buildings or structures under construction 9 A gas fired furnace for installation in a residential garage must be installed as specified in the WARNING box below WARNING FIRE INJURY OR DEATH HAZARD Failure to follow this warning could result in personal injury death and or property da...

Page 7: ...ith the National Fuel Gas Code ANSI Z223 1 NFPA 54 and or Natural Gas and Propane Installation code CSA B149 1 9 After it has been determined that each appliance connected to the venting system properly vents when tested as outlined above return doors windows exhaust fans fireplace dampers and any other gas fired burning appliance to their previous conditions of use 1 4 DETECTION SYSTEMS It is rec...

Page 8: ...Systems ANSI NFPA 90B National Standard of Canada Natural Gas and Propane Installation Code NSCNGPIC CAN CSA B149 1 General installation NFGC and the NFPA 90B For copies contact the National Fire Protection Association Inc Battery march Park Quincy MA 02269 or for only the NFGC contact the American Gas Association 400 N Capitol N W Washington DC 20001 NSCNGPIC For a copy contact Standard Sales CSA...

Page 9: ... from water Not be installed directly on any combustible material other than wood flooring Be located close to the chimney or vent and attached to an air distribution system Refer to section 7 Place the unit so that proper venting can be achieved with a minimum number of elbows in accordance with the instructions in this manual The furnace should be located as close to the chimney vertical venting...

Page 10: ... figure 1 and read the following instructions 1 Remove the oblong knock out from the right side of the casing 2 Place the drain trap gasket on drain trap 3 Install the drain trap on the right side See figure 1 4 Screw in place the drain trap with two head tapping screws on the right side of the furnace 5 Connect the three stubs to the condensate tubings already in place in the furnace 6 Connect th...

Page 11: ...properly Plan your installation to have at least 1 0 ft of clearance under the installed furnace to put the exhaust pipe drainage and drain trap Figure 3 Downflow position 3 2 1 Downflow condensate drain trap connection 1 Remove all condensate tubing from the inducer blower condensate box and vent collector Block the openings with the provided 5 8 and 1 2 black caps In the downflow position the on...

Page 12: ...zontal right position make sure the furnace is tilted foward to make it drain properly Refer to figure 7 Plan your installation and make sure you have sufficient space for the drain trap and exhaust pipe drainage Drain trap will add approximately 6 50 to the furnace width Refer to figure 6 3 3 1 Horizontal right condensate drain trap connection REFER TO FIGURE 6 FOR INSTALLATION DETAILS 1 Remove a...

Page 13: ...osition The pressure switch must also be electrically connected in series with the low fire pressure switch top using the brown jumper provided in the parts bag Refer to figure8 Horizontal right pressure switch connection for more details 3 4 HORIZONTAL LEFT Figure 10 Horizontal left position 3 4 1 Horizontal left condensate drain trap connection REFER TO FIGURE 10 FOR INSTALLATION DETAILS 1 Remov...

Page 14: ...pplied black squared PVC tubing to connect the pressure switch 0 2 in w c to this stub see figure 10 The pressure switch must also be electrically connected in series with the low fire pressure switch top using the brown jumper furnished in the parts bag Refer to figure 12 for more details 3 5 MULTIPOSITION VENTING DRAINAGE All furnaces with horizontal exhaust vent piping must have drain tee assem...

Page 15: ...tatic pressure exceeds the maximum listed on the furnace rating plate check for closed dampers register unproperly size duct work or incorrect dipswitch settings Make sure the temperature rise is coherent with the furnace rating plate 4 3 SMART DUCT SYSTEM Dettson Industries also offers the Smart Duct System Please refer to the Smart Duct Manual X40240 for proper installation of this system Please...

Page 16: ... cover screws 4 Remove both Natural Gas regulator springs from regulator sleeves 5 Insert the L P regulator springs provided in the conversion kit into the regulator sleeves 6 Place the High regulator adjustment screw and adjust approximately 4 turns to the bottom stop 7 Place the Low regulator adjustment screw and adjust approximately 6 turns to the bottom stop 8 Start the furnace and adjust both...

Page 17: ...ement Table 4 Inlet Gas Pressure Gas Pressure in w c psig Minimum Maximum Natural Gas 4 5 10 5 Propane 11 0 13 0 Table 5 Outlet gas pressure Gas Pressure in w c Input Natural Gas Propane High fire 100 3 0 8 6 Low fire 70 1 55 5 0 Table 6 Maximum capacity of pipe Ft hr for pipe length ft m Nominal Iron pipe size in mm Internal dia in mm 10 3 0 20 6 0 30 9 1 40 12 1 50 15 2 1 2 13 0 622 158 175 120 ...

Page 18: ...at may be used with the furnace Consult the thermostat installation instructions for specific information about configuring the thermostat 6 4 1 Single Stage thermostat Use the DIP switches S7 1 and S7 2 see table 7 to configure for a single stage thermostat Options include a 10 minute delay on second stage 20 minute delay on second stage or an auto setting allowing the module to calculate the tim...

Page 19: ...als must be UL S636 listed This requirement does not apply to the combustion air pipe Below are important information that needs to be considered when installing the venting system The vent pipe and combustion air pipe must of be the same diameter Slope horizontal vent piping upward a minimum of 1 4 per foot of run so that condensate drains toward the furnace Support horizontal vent piping at leas...

Page 20: ... pipe must be made as close to the furnace as reasonably possible The maximum allowable vent length for the vent and combustion air pipe when used is listed in table 8 and depends on the furnace input The maximum length must include straight pipe and any fitting and termination Equivalent length of various fitting is list in table 9 A minimum linear length of 5 ft must be respected To properly mea...

Page 21: ... every 5 ft using perforated metal hanging strap or commercially available hangars designed to support plastic pipe 15 Prevent condensate from accumulating in the pipes by sloping the combustion air piping and vent piping downward toward furnace a minimum of 1 4 per linear ft with no sags between hangers 16 Complete the vent installation by installing the required termination See figures 23 to 27 ...

Page 22: ...f ice build up For multiple concentric installation spacing of minimum 12 between each concentric is required Figures 21 and 22 show the required clearance for concentric installation For installation through the roof or side wall cut one 4 102 mm diameter hole for 2 51 mm kit or one 5 127 mm diameter hole for 3 76 mm kit in the desired location Loosely assemble concentric vent combustion air term...

Page 23: ...igure 24 Standard horizontal termination Figure 25 Alternate horizontal termination A Figure 26 Alternate horizontal termination B Figure 27 Alternate horizontal termination C Figure 28 Venting gasket 22 ...

Page 24: ...Figure 29 Direct vent clearance 23 ...

Page 25: ...Figure 30 Other than Direct vent clearance 24 ...

Page 26: ...41 PVC PIPE SDR 21 SDR 26 D2466 PVC Fittings Schedule 40 D2468 ABS Fittings Schedule 40 D2564 For ABS Solvent Cement For PVC D2661 ABS PIPE Fittings DWV at Schedule 40 IPS Sizes D2665 PVC PIPE Fittings DWV at Schedule 40 IPS Sizes F438 CPVC Fittings Schedule 40 F441 CPVC PIPE Schedule 40 F442 CPVC PIPE SDR F493 For CPVC Solvent Cement For CPVC F628 ABS PIPE Cellulare Core DWV at Schedule 40 IPS si...

Page 27: ...room thermostat to the desired temperature These furnaces are equipped with a manual reset limit switch in the burner assembly This switch opens and shuts off the power to the gas valve if an overheat condition flame rollout occurs Correct inadequate combustion air supply or improper venting conditions before resetting the switch DO NOT jumper this switch Before operating the furnace check the fla...

Page 28: ...3 2 ON S3 1 ON D 1 0 635 800 400 S3 2 ON Table 18 CFM C75 2 V 0381210C Dipswitch Max ESP 1st stage 2nd stage Temp Settings w c heating heating rise F S4 3 OFF A 1 0 820 1180 56 S4 4 OFF S4 3 ON B 1 0 834 1200 55 S4 4 OFF S4 3 OFF C 1 0 840 1210 55 S4 4 ON S4 3 ON D 1 0 810 1160 57 S4 4 ON Dipswitch Max ESP 1st stage 2nd stage FAN ON Settings w c cooling cooling G S3 1 OFF A 1 0 1120 1400 435 S3 2 ...

Page 29: ...h ECM motors 8 9 ERROR CODES The control continuously monitors its own operation and the operation of the system If a failure occurs the diagnotic indicator LED will flash a red failure code Please see table 25 for error code details If a failure is internal to the control the red indicator will stay on continuously In this case the entire control should be replaced as the contol is not field repa...

Page 30: ...dic physical inspections of your appliance paying special attention to the gas burner and the flue outlet from the furnace These components are located on the front of the unit A flashlight will be useful for these inspections Make one inspection prior to the beginning of the heating season and another during the middle Should you observe unusual amounts of any of the following conditions it is im...

Page 31: ...ITCH The blower compartment door on your high efficiency gas furnace is equipped with a safety interlock switch that will automatically shut off your complete system including blower once the door is removed This is for your personal safety Be sure to check your furnace for proper operation once the door or panel has been replaced If the system does not operate once the panel has been replaced try...

Page 32: ...Figure 31 Dimensions 31 ...

Page 33: ...Figure 32 Two Stage ECM Wiring diagram 32 ...

Page 34: ...as pressure high fire 100 Outlet gas pressure low fire 70 Static pressure in return Static pressure in supply Temperature rise Is drain trap filled with water Is drain trap outlet vented with a Tee Are condensate tubing properly slopped towards drain trap Furnace leveled or slopped Venting pipe diameter Venting length Venting termination 33 ...

Page 35: ...ke sure flame rod is clean and properly wired 9 Improper grounding or polarity 120V hot and neutral reversed 120V should be read between Hot and ground 0V should be read between Neutral and ground 10 Gas valve current detected with no call for heat Verify if any electrical short could send voltage current to the gas valve If not replace control board 11 Open limit switch for more than 5 minutes Re...

Page 36: ...Figure 33 Exploded view Cxx 2 V part 1 35 ...

Page 37: ...Figure 34 Exploded view Cxx 2 V part 2 36 ...

Page 38: ...2 R02N022 R02N022 R02N022 33 Burner box B40908 01 B40908 02 B40908 03 B40908 04 B40908 05 B40908 07 B40908 08 34 Control board support B40559 B40559 B40559 B40559 B40559 B40559 B40559 35 Transformer 120V 24V L01F009 L01F009 L01F009 L01F009 L01F009 L01F009 L01F009 36 Control board R99G016K R99G016K R99G016K R99G016K R99G016K R99G016K R99G016K 37 Ignitor electric harness B40592 01 B40592 01 B40592 0...

Reviews: