background image

www.desatech.com

55511E

7

Figure 13 - Pipe Connection

LINEAL GAIN

PART NO.

DESCRIPTION

GAIN

368STM

See-Through

66 

1

/

4

"

V368ST

See-Through

54"

(V)12-8DM

Flue Pipe

10 

5

/

8

"

(V)18-8DM

Flue Pipe

16 

5

/

8

"

(V)24-8DM

Flue Pipe

23 

5

/

8

"

(V)36-8DM

Flue Pipe

34 

5

/

8

"

(V)48-8DM

Flue Pipe

46 

5

/

8

"

VRTL-8DM

VRTTL-8DM

Round Top 

Termination

6"

VETL-8M

VETO-8DM

VETLO-8DM

Econo-Top

Termination

1" to 12"

Hemmed 

End

8" Stainless 

Inner Pipe 

Lanced Side 

Up

12 

3

/

8

" Galvanized 

Outer Pipe

Figure 12 - Outside Air Kit Installation

Secure to Collars with 

Duct Tape or Screws

Air Inlet 

Location 

Must Allow 

For Bushes 

or Snow

Vent Hood 

Required for 

Wall Installation

Air Inlet 

Termination

Vented Crawl Space

(Check Local Codes 

Before Installing in a 

Vented Crawl Space)

ChIMNEY PIPE

The DESA Heating, LLC chimney system is 

a snap-lock, double-wall pipe. It consists of a 

stainless steel inner flue pipe(s), a galvanized 

outer pipe and a wire spacer. Each section of 

pipe comes in lengths of 12", 18", 36" and 48". 

The actual lineal gain for each is measured 

after each section is fully connected. Lineal 

gain is the actual measurable length of a part 

after two or more parts are connected.

PIPE INSTALLATION

The pipe sections must be assembled indepen-

dently as the chimney is installed. When connect-

ing chimney directly to the firebox, the inner flue 

VenTing inSTALLATion

Continued

where the chimney penetrates a floor or ceil

-

ing joist space. Their purpose is to establish 

and maintain the required clearance between 

the chimney and the combustible materials. 

When penetrating a floor or ceiling at an angle, 

use firestop spacer number V30FS-8DM (see 

Replacement and Accessory Parts

, page 14).

When the pipe passes through a framed open-

ing into a living space above, the firestop must 

be placed onto the ceiling from below as shown 

in Figure 14, page 8. When the pipe passes 

through a framed opening into an attic space 

above, the firestop must be placed on the attic 

floor as shown in Figure 15, page 8.

SUPPORT SECTIONS

The  chimney  support  section  is  a  4"  strap 

pipe section must be installed first with the lanced 

side up. The outer pipe section can then be in-

stalled over the flue pipe section with the hemmed 

end up. Press down on each pipe section until the 

lances securely engage the hem on the firebox 

starter. The wire will assure the proper spacing 

between the inner and outer pipe sections.

Continue  to  assemble  chimney  sections  as 

outlined above, making sure that both the inner 

and outer pipe sections are locked together 

(see Figure 13). When installing double wall 

snap-lock chimney together, it is important to 

assure the joint between the chimney sections 

is locked. Check by pulling chimney upward 

after locking. The chimney will not come apart 

if properly locked. It is not necessary to add 

screws to keep the chimney together.

FIRESTOP  SPACERS  VFS-8DM

 

(24 PACK)

Firestop spacers are required at each point 

 WARNING: The opening in the 

collar around the chimney at the top 

of the firebox must not be obstruct

-

ed. Never use blown insulation to 

fill the chimney enclosure.

Summary of Contents for (V)368ST

Page 1: ...72 standards or for use with a vent free gas log heater approved to ANS Z21 11 2 standard ThiswoodburningfireboxcomplieswithUL127 CAN ULS S610 M87standardasaFACTORYBUILTAPPLIANCEand is listed and test...

Page 2: ...ufacturer s instruc tions with the insert specifically statethisfireboxhasbeentested for use with the insert Thisfireboxisnotintendedtobe usedasasubstituteforafurnace to heat an entire home Use for su...

Page 3: ...e or stir the logs while they are burn ing Use only fire logs that have beenevaluatedfortheapplication in fireplace and refer to fire log warnings and caution markings on packaging prior to use WARNIN...

Page 4: ...Typ Figure 3 Firebox Clearances Existing Wall Projected Wall 12 30 4 cm to Perpendicular Wall selecting location To determine the safest and most efficient location for the firebox you must take into...

Page 5: ...ing 1 Frame the opening for the firebox using the dimensions shown in Figures 6 and 7 depending on your installation 2 If firebox is to be installed directly on carpeting tile other than ceramic or an...

Page 6: ...ber Protector Noncombustible Hearth Extension Ember Protector Figure 11 Raised Hearth Extension Figure 9 Nailing Flanges Nailing Flanges Prepared Framing Nails or Screws 1 2 1 27 cm Minimum to Combust...

Page 7: ...is to establish and maintain the required clearance between the chimney and the combustible materials When penetrating a floor or ceiling at an angle use firestop spacer number V30FS 8DM see Replaceme...

Page 8: ...8 Firestop Spacer Screws or Staples Min of 8 Existing Ceiling Frame 2 5 1cm Minimum Angled Firestop Ceiling Support Return Elbow 30 FT 9 14m 30 FT 9 14m Figure 16 Elbow Offset Return Elbow 12S 8DM Su...

Page 9: ...4 feet above the roof line use support wires to keep chimney secure Support wires may be attached to outer pipe of chimney with screws if screws do not penetrate inner flue pipe Minimum Maximum Chimn...

Page 10: ...mney Pipe Waterproof Caulk Storm Collar Flashing Flashing Installation Determine flashing to be used with roof open ing chart Slide flashing over pipe until base is flat against roof Replace as many s...

Page 11: ...ifications finishing firebox Installing Firebox Facing Any noncombustible material may be used for facing glass tile brick etc as long as proper clearances are adhered to and firebox openings are not...

Page 12: ...ncoming gas line to wood framing to provide rigidity for threaded end 4 Repack insulation around gas line and into sleeve opening Seal any gaps between gas line and refractory knockout hole with refra...

Page 13: ...e fully open or fully closed position only or a fire hazard may be created see Figure 30 or 31 A firebox equipped with glass doors operates much differently than a firebox with an open front A firebox...

Page 14: ...nition Young children should be care fully supervised when they are in the same room as firebox Technical Service You may have further questions about installa tion operation or troubleshooting If so...

Page 15: ...ly V 12S 8DM Also available in triple wall Double Wall 30 elbow Offset V 30E 8DM Also available in triple wall Firestop Spacer V FS 8DM for Straight Pipe 24 Pack Econo Top Termination V ETL 8DM V ETLO...

Page 16: ...A UPC Bi Fold GLASS DOORS DG368ST Brushed Brass DC368ST Platinum DBP368ST Black Replacement and Accessory Parts Continued DESA Heating LLC 2701 Industrial Drive Bowling Green KY 42101 www desatech com...

Reviews: